Laserfiche WebLink
FL7.I <br /> KAST Construction Company, LLC <br /> 701 Northpoint Parkway,Suite 400 <br /> West Palm Beach, FL 33407 <br /> June 30, 2015 <br /> Dan Trbovich, Project Architect via e-mail: dtrbovich@borreIlia rchitects corn <br /> Borrelli+Partners <br /> 720 Vassar Street <br /> Orlando, FL 32804 <br /> Christopher Kafer, P.E. County Engineer,via e-mail: via e-mail: ckafer@ircgov com <br /> Indian River County Engineering Division <br /> 1801 27'h Street Vero Beach, FL 32960 <br /> Richard B.Szpyrka, P.E. via e-mail: rszpyrka@ircgov.com <br /> Indian River County Engineering Division <br /> 180127 1h Street Vero Beach, FL 32960 <br /> Re: Indian River County Intergenerational Recreation Facility <br /> 1590 91h Street SW, Vero Beach, FL <br /> Subj.: Delayed Construction/Extended Conditions Costs/Conformed Drawings Added Work <br /> Dan/Chris/Rich, <br /> In accordance with the contract documents, articles GC 12.03, SC 11.01. Al and 10.05, (Claims) we <br /> have monitored and tracked the costs KAST has incurred as a direct result of the extended time related <br /> to the delayed issuance of conformed drawings and a building permit. The Conformed documents <br /> were received by KAST on 05/22/2015 at 1:30 PM. The Permitted Set was received by us on <br /> Wednesday the 27th of May 2015. KAST immediately issued the Conformed, (revised) drawings to the <br /> affected subcontractors and vendors for pricing. Most subcontractor and vendor price increases were <br /> received by 06/12/2015 but some price increases were dependent on RFI's and could not be collected <br /> until 6/29/2015 <br /> The project delay commenced on April 16th, 2015 and has continued up to and including June 30, <br /> 2015. 76 days have elapsed since the delay began on 04/16/2015. The following represents the <br /> extended general conditions, (up to and including the 30th of June 2015) and the added costs for the <br /> additional work of the conformed drawings. The work of the conformed drawings has also added <br /> 15 days to the concrete tilt wall durations.Those 15 work days impacted the project schedule by 14 <br /> calendar days, (2 weeks). <br /> a. 1 <br /> 144 <br />