Laserfiche WebLink
Page 3 of 3 <br /> Based on the above evaluation, I conclude that the lowest complete bid was submitted by E&D <br /> Contracting Services. This bidder submitted the lowest adjusted base bid, and the lowest <br /> bid with any of the three possible add alternate scenarios considered. Further, the bidder <br /> submitted its bid with-out exception to the project material specifications. <br /> In summary, E&D Contracting Services bid(s) are: <br /> Base bid: $300,116.00 (headworks rehabilitation) <br /> Add alternates <br /> A. Base bid plus add alt.1: $318,116.00 (headworks and concrete deck <br /> rehabilitation) <br /> B. Base bid plus add alt.2: $312,656.00 (headworks rehabilitation and exterior wall <br /> repair and repaint) <br /> C. Base bid plus add alt.1 and 2: $330,656.00 (headworks and concrete deck <br /> rehabilitation and exterior wall repair and repaint) <br /> If you concur with the above, I would recommend that E&D Contracting Services' references, <br /> license(s), bonds, etc. and other-submittals and submitted information are evaluated and checked <br /> to be acceptable. <br /> Upon your review, please let me know if you would like to discuss the above summary or anything <br /> else pertinent to the bids for the IRCDUS Central Wastewater Treatment Facility Headworks <br /> Rehabilitation project. <br /> Sincerely <br /> / X//�� <br /> Josph WySc ulke, P.E. <br /> 62 <br />