Laserfiche WebLink
Florida Statutes: 850-035-01 <br /> 334.044(7) PAVEMENT MANAGEMENT <br /> OGC—02/15 <br /> Page 15 of 21 <br /> Exhibit A <br /> SCOPE OF WORK <br /> DELIVERABLES <br /> CR-512 from Roseland to SR-5/US-1 <br /> FM# 431160-1-54-01 <br /> This Project will consist of construction (resurfacing) and CEI services of dual westbound <br /> lanes from Roseland Road to US-1 and eastbound lanes from Easy Street to US-1, which <br /> consists of milling the existing asphalt and constructing a 1-1/2" thick asphalt overlay. The <br /> Project work will also include, but is not limited to installation of vehicular detector <br /> assemblies, roadway striping and signage, and Maintenance of Traffic (MOT). <br /> 88 <br />