My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-064
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 10:18:26 AM
Creation date
5/4/2016 10:18:25 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
05/03/2016
Control Number
2016-064
Agenda Item Number
8.F.
Entity Name
Carter Associates
Subject
Amendment No. 2 to Work Order No.1
Intersection improvements
Area
41st. St. and U.S.Highway 1
Project Number
1359
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• CAI will prepare detailed construction drawings which will include revised roadway grading <br /> plan/profile sheets, revised drainage, revised typical sections and cross-section sheets, <br /> revised striping and signage sheets,revised summary of quantities sheet, and revised general <br /> notes,details and specification sheets. <br /> • CAI will coordinate with City of Vero Beach Electric Department, Comcast and AT&T to <br /> keep the utilities advised of the design changes and to facilitate any new utility adjustments <br /> that may result from the redesign. <br /> • CAI will coordinate with CAI's signalization subcontractor (McMahon Associates, Inc.) to <br /> facilitate any signatization adjustments that may be required as a result of the redesign. <br /> • CAI will coordinate with the FDOT to void the previous submitted permit application. CAI <br /> will coordinate with the FDOT to address drainage, signalization, utility and roadway <br /> connection permit requirements and CAI will prepare and submit new FDOT permit <br /> application(s). <br /> • CAI will prepare and submit an application for a permit modification to the existing <br /> SJRWMD permit. <br /> • CAI will resubmit the revised design drawings to the FECRR and to their consultant,Xorail. <br /> CAI will coordinate with FECRR/Xorail to obtain FECRR permit. <br /> • CAI will prepare a revised Opinion of Construction Cost. <br /> • CAI will submit the revised detailed construction drawings to COUNTY engineering staff <br /> for review and comment. <br /> Compensation:_ <br /> CAI's fees are.......................................................................$50,270.00 <br /> McMahon's fees are summarized as follows(Reference Attachment): <br /> Task 1 —Mast Arm Revisions @ US 1............................................$3,140.00 <br /> Task 2—Structural support analysis .$2,180.00 <br /> McMahon's fees total.................................................................$5,920.00 <br /> GrandTotal .......................................................................$56,190.00 <br /> CAI looks forward to furnishing the services described herein. If you have any questions regarding <br /> our proposed scope of work,please feel free to call me at your convenience. <br /> Sincerely, <br /> C TER ASSOCIATES, INC. <br /> ;V� klth� <br /> Patrick S. Walther,P.E. <br /> Principal/Project Manager <br /> Attachment <br /> �A—KnE <br /> nnorida <br /> ce 1911 <br /> N•\PS W\P\14-84E IRC 41st St\ProposalAlIevAmendment 2 Proposal 4-5-2016.doc Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.