Laserfiche WebLink
Patrick S.Walther,P.E. <br /> March 17,2016 <br /> Page 2 <br /> Subsequent to completion of the plan for that installation, several factors have occurred requiring <br /> revisions to the plan. Those factors include the redesign of the intersection improvements such as <br /> elimination of grade changes within the limits of the intersection. The need for additional new mast <br /> arms has also arisen due to coordination with FDOT and revised design standards. <br /> Information to be provided by Carter Associates for this supplemental agreement includes those items <br /> listed in the original agreement,dated March 11,2015. <br /> TASK 2—STRUCTURAL SUPPORT ANALYSIS <br /> Coordination with.FDOT on the original traffic signal design scope of work resulted in the need to <br /> consider the addition of back plates to the remaining existing signal heads at the US-1/415' Street <br /> i <br /> intersection. Structural analysis is being required for the signals that are not otherwise affected by the i <br /> intersection improvements and were not considered in the original project scope. McMahon will <br /> complete the structural support analysis using the FDOT"Mastarm"software. If the existing structure <br /> can accommodate the addition of back plates, the design will reflect the back plates. If the existing <br /> signal supports cannot accorrunodate the back plates,the analysis will be provided to FDOT;however, <br /> the design will not include the addition of back plates. <br /> The services to be performed pursuant to this agreement are strictly limited to those expressly set forth <br /> herein. <br /> FEE <br /> The lump sum fee for the above-mentioned tasks are as follows: <br /> Task 1-Mast arm design revisions at US-1 $3,740.00 <br /> Task 2—Structural support analysis $2,180.00 <br /> Total fee for Supplemental Agreement No.1 $5,920.00 <br /> If additional services are required that exceed those identified in the original Scope, of Work or <br /> Supplemental Agreement Number 1, a second supplemental agreement will be submitted to the client <br /> for review and approval prior to the commencement of any additional tasks. Additional services will <br /> commence upon written authorization to proceed by the client. <br /> SCHEDULE <br /> We are prepared to initiate work on the project upon receipt of written authorization to proceed. <br /> McMahon will use its best efforts to complete this work in accordance with the client's meeting <br /> schedule. <br />