Laserfiche WebLink
McAT TO� 11 400 1 ON ASSOCIATES, INC. <br /> 1^l 2090 Palm Beach Lakes Blvd,Suite 400 l West Palm Beach,FL 33409Mj <br /> �— p 561-840.8650 1 f 561-840.8590 <br /> mcmahonassociates.com <br /> i <br /> PRINCIPALS <br /> Joseph W.McMahon,P.E. <br /> March 18 2016 Joseph J.DeSands,P.E.,PTOE <br /> John S.DePalma <br /> William T.Steffens <br /> Casey A.Moore,P.E. <br /> Gary R.McNaughton,P.E.,PTOE <br /> VIA E-MAIL <br /> ASSOCIATES <br /> John J.Mitchell,P.E. <br /> Mr.Patrick S.Walther P.E. <br /> Christopher Trent Williams,P.E. <br /> , R.Trent Ebersole,P.E. <br /> Carter Associates,Inc. Matthew M.Kozsuch,P.E. <br /> 1708 21st Street Maureen Chlebek,P.E.,PTOE II <br /> Vero Beach,Florida 32960 <br /> RE: US-1 at 41a1 Street Signal Design Plan—Supplemental Agreement No.2 <br /> McMahon Project No.N15067.OP <br /> Dear Pat: <br /> McMahon Associates,Inc. (McMahon) is pleased to provide this supplemental agreement for the US-1 <br /> at 4151 Street Signal Design project, in Vero Beach, Florida. This proposal is for additional services <br /> related to traffic signal modification design services at the US-1/41s1 Street intersection.-The-additional - - - <br /> services are for the design of a new traffic signal at the adjacent intersection of Old Dixie and 41i1 Street. j <br /> The design will require coordination with Vero Beach Power and FEC railroad. <br /> i <br /> This agreement is based on the assumption that all project baseline geometry, existing and proposed <br /> right-of-way, topographic, geotechnical, and sub-surface utility exploration (SUE) information <br /> necessary to complete the design,will be provided by Carter Associates,Inc. j <br /> I <br /> In order to provide the proper design for the traffic signal supports, Carter Associates, Inc. must <br /> provide subsurface soil information. Soil borings will be obtained in the field by a Geotechnical <br /> Engineer, at all corners of the study intersection. The geotechnical information will be analyzed and <br /> the project Geotechnical Engineer will provide a standard report. This information will be utilized for <br /> the design of traffic signal mast arm supports. If right-of-way or other project constraints dictate that a 1 <br /> proposed mast arm base must be placed within the vicinity of an existing underground utility, then <br /> Carter Associates, Inc. will provide the sub-surface utility exploration (soft dig) necessary to identify <br /> the utility conflict. If additional right-of-way or easements are required for the proposed signal <br /> equipment locations,Carter Associates,Inc.will obtain the necessary agreements. <br /> The Scope of Work includes the following tasks: <br /> i <br /> Corporate Headquarters: Fort Washington,Pennsylvania <br /> Serving the East Coast from 13 offices throughout New England,the Mid-Atlantic, and Florida <br /> i <br />