My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-065
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2016 10:26:36 AM
Creation date
5/4/2016 10:26:35 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
05/03/2016
Control Number
2016-065
Agenda Item Number
8.F.
Entity Name
Carter Associates
Subject
Amendment No. 3 to Work Order No.1
Intersection improvements
Area
41st. St. and U.S.Highway 1
Project Number
1359
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Patrick S.Walther,P.E. <br /> March 18,2016 <br /> Page 3 <br /> D. Mast Arm Detail Sheets—For purposes of this proposal, it is assumed that the mast arm <br /> design will be in conformance with the FDOT Mast Arm Assemblies Indices. The Mast Arm <br /> Details sheets will include the tables showing the mast arm pole and arm designations, as <br /> well as the signal and sign data for each mast arm structure. <br /> TASK 2—COORDINATION <br /> Based on a preliminary site visit,there are overhead utility lines and structures in every quadrant of the <br /> intersection that will require coordination with Vero Beach Power and Carter Engineering, Inc. It is <br /> anticipated that signal equipment will need to be located within the FEC Railroad right-of-way. In <br /> addition, Rail pre-emption with interconnection to the railroad controller will be required. <br /> Coordination with FEC,including obtaining approval of plans,will also be required. <br /> The services to be performed pursuant to this agreement are strictly limited to those expressly set forth <br /> herein. <br /> FEE <br /> The lump sum fee for the above-mentioned tasks are as follows: <br /> Task 1—Traffic Signal Plans Preparation $17,180.00 <br /> Task 2—Coordination $4,360.00 <br /> Total fee for Supplemental Agreement No.2 $21,540.00 <br /> If additional services are required that exceed those identified in the original Scope of Work or <br /> Supplemental Agreement Number 1, a second supplemental agreement will be submitted to the client <br /> for review and approval prior to the commencement of any additional tasks. Additional services will <br /> cornmence upon written authorization to proceed by the client. <br /> SCHEDULE ' <br /> l <br /> We are prepared to initiate work on the project upon receipt of written authorization to proceed. <br /> McMahon will use its best efforts to complete this work in accordance with the client's meeting <br /> schedule. <br /> i <br /> I <br /> TERMINATION 1 <br /> This agreement may be terminated by the authorized representative effective unmediately on receipt of I <br /> written notice. Payment will be due for services rendered through the date written notice is received. <br /> i <br /> i <br /> i <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.