My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-042
CBCC
>
Resolutions
>
2010's
>
2016
>
2016-042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2018 11:13:23 AM
Creation date
5/4/2016 11:40:37 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2016-042
Approved Date
05/03/2016
Agenda Item Number
12.F.1
Resolution Type
Asphalt Milling
Entity Name
Emerson Park Subdivision
Subject
Asphalt Milling Improvements
Time and Place of Public Hearing
Area
2nd St. between 35th Ave. and 32nd Ave.
Document Relationships
2016-065
(Message)
Path:
\Resolutions\2010's\2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ESTIMATE FOR: <br />#1525, 2nd Street From 35th Avenue to 32nd Avenue <br />ASPHALT MILLINGS <br />4/19/2016 <br />Project #1525 <br />TOTAL S.F 216,024.00 <br />1. CONSTRUCTION $63,116.15 <br />2. ENGINEERING <br />(5% of.construction cost) $3,155.81 <br />TOTAL CONSTRUCTION & ENGINEERING $66.271.96 <br />3. PERMIT FEES $200.00 <br />4. TESTING $2,000.00 <br />5. RECORDING FEE $1,00000 <br />SUB -TOTAL $69.471.96 <br />6. 3.00% ADMIN. FEE $2,084.16 <br />TOTAL COST OF PROJECT 1 $71,556.121 <br />75% TO BE PAID BY PROPERTY OWNERS <br />2% COLLECTIONS FEE (75% FIGURE) <br />25% TO BE PAID BY COUNTY <br />COST PER S.F. 1 $0.2533997611 <br />$53,66709 <br />$1,073.34 <br />TOTAL ASSESSMENT 1 $54,740431 <br />$17,889.03 <br />F -\Public Works\ENGINEERING DIVISION PROJECTS\1525-2nd St Millings_32nd Ave to 35th Ave\Design\Assessment\1525 Asphalt <br />Millings Assessment 4-19-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.