Laserfiche WebLink
F. <br />G. <br />11:18 <br />a.m. <br />Harriet Greene voiced her passion for youth safety and the Dori <br />Slosberg Driver Education Program. <br />The Chairman CALLED THE QUESTION and the Motion <br />carried unanimously. <br />Public Works <br />None <br />Utilities Services <br />1. Draft Alternative Water Supply Plan Phase I Preliminary <br />Evaluation <br />(memorandum dated January 9, 2015) <br />150-168 <br />Jill Grimaldi, Senior Project Manager with CDM Smith, Inc. <br />(CDM), used a PowerPoint presentation to outline the draft <br />Alternative Water Supply Evaluation report, which included: <br />the six proposed phases of the project; existing conditions; <br />reservoir sizing; the existing water treatment plant capacity; <br />agricultural demand; required acreage; pollutant load <br />reduction; cost estimates; aquifer storage/recovery; and the <br />pros and cons of adding a surface water reservoir (SWR) or an <br />Aquifer Storage and Recovery (ASR). <br />Discussion ensued throughout the presentation as <br />Commissioners posed questions to staff and expressed opinions <br />regarding CDM's report. <br />Commissioner O'Bryan read the Indian River Neighborhood <br />Association's comments into the record, which supported staff's <br />recommendation (on file). <br />The Chairman called for a break at 12:33 p.m., and reconvened <br />the meeting at 12:43 p.m., with all members present. <br />MOTION WAS MADE by Vice Chairman Solari, SECONDED <br />by Commissioner Flescher, to distribute the study to alt <br />stakeholders, especially St. Johns River Water Management <br />District and incorporate their comments in the final report. <br />Commissioner O'Bryan pointed out that the second part of <br />staffs recommendation was to negotiate a cost proposal with <br />CDM to embark on Phase 2 — modeling to determine the <br />SmeadSoft Reprint Date: Wednesday, May 11, 2016 - 10'21'37 - BCC'2082, Attach7merit Idlljage 13)Iume of water in the Sebastian canal system. He <br />