Laserfiche WebLink
Table of Contents <br />Executive Summary ES -1 <br />ES.1 Background ES -1 <br />ES.2 Evaluation ES -2 <br />ES.2.1 Demand Projections and Reservoir Sizing ES -3 <br />ES.2.2 Conceptual Estimates of Probable Cost ES -3 <br />ES.2.3 Indian River Lagoon Impacts ES -5 <br />ES.3 Recommendations ES -6 <br />ES.4 Next Steps ES -7 <br />Section 1 Introduction 1-1 <br />1.1 Background 1-1 <br />1.2 Phase 1 Objectives 1-2 <br />Section 2 2007 Alternative Water Supply Master Plan 2-1 <br />2.1 Summary 2-1 <br />2.2 Previous AWSMP Recommendations 2-1 <br />2.3 Review of AWSMP 2-2 <br />Section 3 Stakeholders 3-1 <br />3.1 Intention 3-1 <br />3.2 Interested Parties 3-1 <br />3.3 Stakeholder Involvement 3-2 <br />Section 4 Site Identification and Environmental Considerations 4-1 <br />4.1 Background 4-1 <br />4.2 Land Use 4-3 <br />4.3 Soil and Hydrologic Conditions 4-3 <br />4.4 Wetlands 4-3 <br />4.5 Listed Species 4-6 <br />4.6 Flood Zones 4-8 <br />Section 5 Additional Siting Considerations 5-1 <br />5.1 Permitting 5-1 <br />5.2 Proximity to Sources and WTP 5-2 <br />5.3 Vulnerability and Security 5-2 <br />5.3.1 Wildlife 5-2 <br />5.3.2 Debris, Algae and Invasive Aquatic Vegetation 5-4 <br />5.3.3 Vandalism and Acts of Terrorism 5-4 <br />Section 6 Reservoir Sizing 6-1 <br />6.1 Utility Demand 6-1 <br />6.2 Agricultural Demand 6-3 <br />6.3 Reservoir Sizing 6-4 <br />Smith <br />PW XM1.6706.104012.03.11 <br />0 2014 CDM Smith In . <br />Al Rights Reserved <br />155 <br />