My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/20/2015 (4)
CBCC
>
Meetings
>
2010's
>
2015
>
01/20/2015 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:21:33 PM
Creation date
5/11/2016 11:05:54 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/20/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Alternative W01.t. Supply <br />Appendices <br />Appendix A — CDM Smith Work Order Exhibit A <br />Appendix B — Stakeholder List <br />Appendix C — FNAI and IPAC Matrices <br />Appendix D — Water Budget Analysis <br />Appendix E — Cost Estimates <br />Appendix F — Property Appraiser Parcel Ownership Information <br />Tables <br />Table ES -1 Summary of Conceptual Capital, O&M, and Unit Production Costs ES -5 <br />Table ES -2 Estimated Cost per Pound of nutrients Removed ES -6 <br />Table 4-1 Federal and State Listed Species with the Potential to Occur within the Study Area ..4-8 <br />Table 6-1 SJRWMD Water Supply Plan Demand Summary by Type 6-3 <br />Table 6-2 Raw Water Monthly Peaking Factors for Indian River County Utilities 6-8 <br />Table 6-3 Hazard Potential Classification System for Dams 6-10 <br />Table 6-4 Reservoir Configurations for Different Demands from the Water Balance Analyses <br />for 100 Percent Reliability 6-11 <br />Table 7-1 Cost Estimate Classification Matrix 7-3 <br />Table 7-2 Summary of Conceptual Construction Costs 7-4 <br />Table 7-3 Summary of Land Acquisition Costs 7-5 <br />Table 7-4 Summary of Conceptual Capital, O&M, and Unit Production Costs 7-5 <br />Table 8-1 TMDL Allocations in the Central IRL Subbasin 8-1 <br />Table 8-2 Water Quality Data Summary for Nitrogen 8-5 <br />Table 8-3 Water Quality Data Summary for Phosphorus 8-6 <br />Table 8-4 TN and TP Load Reduction Estimates 8-7 <br />Table 8-5 Estimated Cost per Pound of Nutrients Removed 8-7 <br />Table 9-1 2035 County -Wide Urban Service Area Demand Projections 9-1 <br />Table 11-1 Summary of Conceptual Capital, O&M, and Unit Production Costs 11-1 <br />Figures <br />Figure ES -1 Conceptual Reservoir Layout ES -3 <br />Figure 4-1 Project Area 4-3 <br />Figure 4-2 SJRWMD 2009 General Land Use 4-4 <br />Figure 4-3 Native Soil Inventory 4-5 <br />Figure 4-4 National Wetlands Inventory 4-7 <br />Figure 4-5 Current and Historical FEMA Flood Zones for Indian River County, Florida 4-10 <br />Figure 5-1 Desired Project Vicinity 5-3 <br />SDM <br />mith <br />P W _XM 1.6706.109012.03.11 <br />O 2019 CDM Smith Inc. <br />All Rights Reserved <br />157 <br />
The URL can be used to link to this page
Your browser does not support the video tag.