Laserfiche WebLink
Exhibit 1 <br /> CB&I Coastal Planning & Engineering, Inc. <br /> CEI 2481 NW Boca Raton Blvd. <br /> Boca Raton, FL 33431 <br /> Tel:+1 561 391 8102 <br /> Fax: +1 561 391 9116 <br /> www.CBI.com <br /> March 21,2016 <br /> James Gray <br /> Indian River County <br /> Public Works- Coastal Engineering Division <br /> 1801 27th St,Building A <br /> Vero Beach,FL 32960 <br /> Subject: Work Order#13 <br /> Indian River County Sector 3 Beach Restoration Project and Dune Repair Project <br /> Post Construction Physical Monitoring Services-2016 <br /> Dear James: <br /> This proposal outlines a scope of work for CB&I Coastal Planning & Engineering, Inc. (CB&I), f/k/a Coastal <br /> Planning & Engineering, Inc. to provide services in support of one year of annual physical monitoring to fulfill <br /> FDEP and USACE permit requirements of the Sector 3 Beach and Dune Restoration Project constructed between <br /> 2010 and 2012 and the Sector 3 Dune Repair Project constructed 2014/2015. This proposal also includes a third <br /> party peer review of the UMAM Analysis performed by CSA, and if necessary, quantification of hardbottom <br /> impacts. <br /> The 2016 Physical Monitoring Services entails the following: <br /> • "Year 5"annual post construction physical monitoring of the Phase 2 project area(R-26+500—R-36), <br /> • "Year 1"annual post-construction physical monitoring for the Sector 3 Dune Repair Project Area(R-24— <br /> R-55). <br /> Physical Monitoring Report <br /> The Indian River County Sector 3 Beach Restoration Project and Dune Repair Project were constructed under <br /> permitting authority of the Florida Department of Environmental Protection (FDEP) and United States Army <br /> Corps of Engineers(USACE). These permits(FDEP permit No. 0285993-001-JC, FDEP permit modification No. <br /> 0285993-008-JN, USACE permit SAJ-2007-01645, and USACE permit modification SAJ-2007-01645(MOD- <br /> AWP)) contain permit conditions pertaining to construction and post-construction periods. FDEP permit <br /> condition 56 (d)requires an engineering report be submitted to the FDEP within 90 days following completion of <br /> each post-construction survey. <br /> We understand that Morgan & Eklund will perform the physical monitoring from R-30 to R-60, and be <br /> responsible for certifying the survey data and submitting a survey report to the FDEP. Land & Sea Surveying <br /> Concepts,Inc., via a separate contract with the Sebastian Inlet District, will perform the physical monitoring from <br /> R-15 to R-30. They will certify the survey data and submit a separate survey report to the FDEP. CB&I will <br /> review both data sets to ensure that it conforms to the standards required by the FDEP physical monitoring plan. <br /> CB&I will notify the County of any issues with the survey data and will participate in a conference call with the <br /> County,Morgan&Eklund, and Land& Sea Concepts to discuss any issues. <br />