Laserfiche WebLink
Commissioner Bird reported that the grass planting is <br />continuing and we will be planting for probably another week to <br />10 days. The construction on the maintenance building is <br />continuing. It looks as if it will be finished in 2-3 weeks and <br />then the superintendent can start moving in some equipment. As <br />far as the actual construction and shaping of the golf course, <br />Goettler probably will be finished within the next 10 days to 2 <br />weeks. At that time the planting will be finished and the golf <br />course will be pretty much turned over to the superintendent to <br />maintain. He is in the process of interviewing some people <br />through our Personnel Dept. and lining up some additional <br />equipment. The construction drawings on the clubhouse and cart <br />building are finished. They have been advertised for bid and the <br />bids are to be opened on October 29th. Architect Charles Block <br />still feels confident that both of those buildings should come in <br />within budget. We are going to be tight on a construction <br />timetable on the clubhouse. The cart building .probably can be <br />completed within 90 days for our projected February 1st opening, <br />but it is going to be tight on the clubhouse, as it may take 120 <br />dans to - build it. If it does, we may have to come back to the <br />Board for a solution of using a temporary trailer or something to <br />collect fees. Hopefully, both of the buildings can be built <br />within the 90 days and be ready for the opening on February 1st. <br />Administrator Balczun advised that OMB Director Joe Baird is <br />in the process of developing a line item for the golf course, and <br />Director Baird explained that we have a capital budget, but we <br />are working on an operating line by line budget. They will bring <br />those figures back to the Board to see how we stand. <br />SOUTH COUNTY FIRE DISTRICT <br />The Chairman announced that immediately upon the close of <br />today's meeting, the Board would reconvene acting as the Board of <br />Fire Commissioners of South Indian River County Fire District. <br />Those Minutes are being prepared separately. <br />85 BOOK 66 <br />OCT 14 1986 F,{UE <br />- <br />