Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Ke Golden Sands Park - Master Plan Phase I Cost Estimate <br />The Board reviewed the following cost estimate dated <br />10/26(86: <br />Ii1caEroneersArchitects <br />Msyes, Suddertlt & EUmnxlge, hro. <br />11"0M*eR 757s'Dr•. Phitlr;FS $IVA. <br />ORLANDO. FLORIDA 32819 <br />305-361-2981 1 <br />TO ZJ(dut rz;-Jef COt..KIr <br />IiG k)ofVS �L�/►bimw <br />1840 216t1 Gjt"treG 1 <br />UP.t'O Bz," .fit, <br />GENTLEMEN: � .,,ic �` `+ <br />WE ARE SENDING YOU Er Attached 01 Under separate cover via a following items: <br />❑ Shop drawings 931"Prints ❑ Plans ❑ Samples 0 Specifications <br />❑ Copy of letter ❑ Change order ❑ <br />DAT[ JO. fl0 <br />O I& ,p <br />.M. .o. <br />I <br />�� Hr�U,g�.n ,tivrn <br />COPIES DATE NO. - DESCRIPTION <br />t!�oldt>ti, r Mast -G - <br />THESE ARE TRANSMITTED as checked below: <br />C] For approval <br />❑ Approved as submitted <br />01 -or your use <br />❑ Approved as nored <br />❑ As requested <br />❑ Returned for corrections <br />❑ For review and comment <br />❑ <br />❑ FOR BIDS DUE <br />19 <br />❑ Resubmit <br />copies for approval <br />❑ Submit <br />copies for distribution <br />❑ Retum <br />corrected prints <br />❑ PRINTS RETURNED AFTER LOAN TO US <br />IVlAYF.R. SiVDI)FRTR .ANT) ET11FRED013. INC. <br />SIGNED: 1r--Tiia- <br />It e -1—.e e.e not ei noted. Lundy nobly of of e *- <br />GOLDEN SANDS PARR <br />FIRST PHASE CONSTRUCTION <br />COST ESTIMATE <br />e Item <br />Cost <br />Restrooms Building <br />$ 60,000.00 <br />Playground Structure <br />11,000.00 <br />Picnic Shelters 10'x10'(5) <br />9,000.00 <br />Parking & Driveway <br />111,155.00 <br />Dune Walkover w/Ramp & Lifeguard Tower <br />28,000.00 <br />Dune Walkover w/Steps <br />16,000.00 <br />Well & Pump <br />3,500.00 <br />500.00 <br />Signa <br />Concrete Walk <br />5,700.00 <br />Mulch Paths <br />1,876.00 <br />Fence & Gates <br />16,690.00 <br />Landscape & Irrigation <br />13,000.00 <br />Bicycle.Rack <br />385.00 <br />Clearing & Grubbing <br />16,500.00 <br />Water Distribution <br />1,250.00 <br />Septic Drainfield <br />1,500.00 <br />Benches <br />360.00 <br />Outdoor Showers (2) <br />1,000.00 <br />Grille (5) <br />335.00 <br />Trash Cans (6) <br />612.00 <br />Earthwork <br />5,000.00 <br />Continquency (10%) <br />30,363.00 <br />Engineering (10%) <br />30,363-.00 <br />TOTAL <br />$364,089.00 <br />19 <br />9�T 211986 - BOOK <br />66 F�,ir130 <br />