My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/2/1986
CBCC
>
Meetings
>
1980's
>
1986
>
12/2/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:53:20 AM
Creation date
6/12/2015 1:18:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
12/02/1986
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC 2 1996 BOOK <br />CHANGE ORDER #2 <br />Fertigation Tank Slab <br />850.00 <br />Steel Dogleg for Pump Stagy <br />2,750.00 <br />Installation of Pipe 8" <br />(2640 x 4.25) <br />11,220.00 <br />Installation of Trans. pump <br />1,100.00 <br />_ _--- Installation of Pipe 18" <br />- (11.00 x 840) <br />9,240.00 <br />Installation of Pipe 18" <br />(11.00 x 350) <br />3,850.00 <br />Increase Performance Bond <br />725.25 <br />29,735.25 <br />CHANGE ORDER #3 <br />Bulkhead _-70 @280 <br />(19,600.00) <br />Performance Bond <br />(19,600 x 2 1/20) <br />(490.00) <br />(20,090.00) <br />CHANGE ORDER #4 <br />Tap 36 @25.00 <br />900.00 <br />Install Pipe (1600 x 1.15) <br />1,840.00 <br />Performance Bond <br />68.50 <br />2,808.50 <br />CHANGE ORDER #5 <br />Install PVC Pipe 611 <br />(460 x 2.22) <br />1,021.20 <br />Transfer Line <br />408.16 <br />Install pipe (120 x 3.22) <br />386.40 <br />Install,Pipe (120 x 2.69) <br />322.80 <br />Poly Tubing (54.00 x 15) <br />810.00 <br />Performance Bond <br />73.71 <br />3,022.27 <br />CHANGE ORDER #6 <br />Engineering <br />3,240.00 <br />TOTAL CONTRACT AMOUNT <br />RECOMMENDATION: <br />3,240.00 23,926.10 <br />1,117,191.00 <br />The Honorable Board of County Commissioners approve the <br />Guettler & Sons,Inc. contract amount including all change <br />orders and authorize retainage be released by Tommy Thomas <br />after his final inspection and acceptance. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously approved <br />Guettler & Sons, Inc., total contract amount, includ- <br />ing all change orders, in the amount of $1,117,191., <br />and authorized release of the retainage of $166,332.90 <br />upon final inspection and acceptance by Intergovern- <br />mental Relations Director Thomas. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.