Laserfiche WebLink
based on contingencies outlined in the above memo <br />dated November 21, 1984. <br />SAID RESOLUTIONS WILL BE MADE A PART OF THEcR�CORD WHEN FULLY <br />COMPLETED AND RECEIVED. <br />REPORT ON SANDRIDGE GOLF CLUB �. <br />Intergovernmental Relations Director Thomas advised that he <br />has certain items where he needs direction from the Board. He <br />noted that the Board did authorize staff to proceed on the cart <br />paths and on the bridges. The cart paths went out to bid, and we <br />will be opening the bids in about a week. He informed the Board <br />that he authorized staff to put back the metal bridge we have on <br />hand, which they are renovating, and that will be on a sublateral <br />canal in front of the clubhouse. Authorization is needed for <br />staff to proceed to negotiate on the balance of the construction, <br />which Director Thomas assumed would include the cart storage <br />building and paving . <br />Chairman Scurlock asked if the County Attorney has :gotten an <br />opinion about those bids, and Attorney Vitunac said that he had <br />not; he has contacted Architect Charles Block but has not yet <br />actually looked at the documents. <br />Chairman Scurlock believed Director Thomas is asking for <br />something we can't do until we get that opinion, and Mr. Thomas <br />agreed. He further informed the Board that he has talked to <br />Carter & Associates; the engineering will be ready this week on <br />the bridges, and he would like authorization to work with Public <br />Works Director Jim Davis, who is a certified bridge engineer, to <br />proceed and/or go to bid on the bridges. <br />ON MOTION by Commissioner Bird, SECONDED by Commis- <br />sioner Eggert, the Board unanimously authorized staff to <br />proceed as discussed by Director Thomas contingent on <br />Architect Charles Block signing off on the bidding. <br />DEC 2 1986 43 Boor 66 Pr�E 567 <br />