Laserfiche WebLink
r—IJAN v 'Jul <br />BOOK ?� F": E �95 <br />(C) - 3. Provide equipment and wiring for duplication of all monitoring equipment required for <br />room 102 in 911 at supervisor booth location. Includes duplication of annunciator panel, <br />emergency alert system, CCTV monitoring and switches, etc. Also provide for extension of <br />wiring for CCTV cameras to 911 location as required. (Completes item 9 underslab costs). <br />Cost $5,431.00 <br />(C) - 4. Provide footings, block wall, stucco, waterproofing, paint, concrete pad, gates and <br />hardware to duplicate A/C enclosure on south (west) side of sheriff's building on south (east) , <br />for 911 A/C condensers. <br />� 4 Z, 5oG <br />Cost <br />(C) - 5. Provide wiring and camera outside of 911 room for monitoring 911 entrance. <br />Cost $2,533.00 <br />(C) - 6. Provide 30' minimum grounding rods in triangular pattern a shown on revised <br />drawings. <br />Cost $1,340.00 <br />� ��ro�ed, �y ��►d 96 teeabtwerldecl <br />in '�hopoc�l , <br />(C) - 7. Provide fixed camera in room 100 ( lobby) for monitoring of front door. <br />Cost $2,533.00 <br />(D) - 8. Provide camera at shop building exterior to monitor jail activities (completes item <br />18 of underslab costs). <br />Cost $2,621.00 <br />Subtotal (C) Items $MA49--W I�,9b9,00 <br />Subtotal (D) Items 2.621.00 <br />TOTAL COST (C) AND(D) $2.1;47,$ a0, STC1.00 <br />Contractors Liability .5% .005 }9-7 88- _ I U : •9 `f <br />SUBTOTAL $x:69 do, (091.94 <br />Permit Cost .356 .003 ( gf}• &Q.07 <br />SUBTOTAL $2+-,642-.80 <br />ao, Is4.0 f <br />Contractors OH & P l OX .10 2.164.00- ?, � <br />SUBTOTAL $23,806.00 aa, g a9 , y- <br />B and Cost 1.5 X. 015 -0 342. y y <br />GRAND TOTAL (C) AND (D) *241 d3) i -11 • 85 <br />COUNTY -INITIATED REZONING TO CL (TROPICAL VILLAGE ESTATES) <br />The hour of 9:15 o'clock A.M. having passed, the Deputy <br />Clerk read the following Notice with Proof of Publication <br />attached, to -wit: <br />24 <br />