My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/13/1987
CBCC
>
Meetings
>
1980's
>
1987
>
1/13/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:26:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/13/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: BOARD OF COUNTY COMMISSIONERS DATE% JANUARY 5, 1987 <br />THRU: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />VIA: TERRANCE G. PINTO <br />.DIRECTOR OF UTILITY S S <br />FROM: JEFFREY K. BARTON <br />ASSISTANT DIRECTOR OF UTILITY SERVICES <br />SUBJECT: SOUTH BEACH - ASSESSMENT ROLLS <br />BACKGROUND <br />Indian River County Division of Utility Services has been working <br />with the City of Vero Beach, franchisers, and property owners within <br />several subdivisions on the South Barrier Island of Indian River <br />County to facilitate the construction of water and sewer improvements <br />to benefit their properties. This area is within 'the City of Vero <br />Beach's service territory of the unincorporated Indian River County. <br />The County will be agreeing to act as the agent in providing the <br />up -front funds to complete the construction projects and the County <br />will be placing an assessment lien against the benefitted owners' <br />properties. The projects should be outlined'as follows: <br />A. Anglers Cove Wastewater Improvements <br />B. St. Christopher's Harbor and Seminole Shores Wastewater <br />Improvements. <br />C. St. Christopher's Harbor Water Improvements ` <br />D. Seminole Shores Water Improvement <br />Utility staff and project engineers had a workshop with the <br />benefitted owners on December 17, 1986 to discuss the project's scope <br />and cost. <br />RECOMMENDATION <br />Utility staff recommends to the Board of County Commissioners that <br />they approve the four (4) projects and instruct staff to proceed to <br />the next public hearing to levy the assessment lienss <br />a defined in <br />County Ordinance No. 81-27, with the exception p n that Project A <br />(Anglers Cove) be changed to reflect that Tract B is two building <br />sites and the totalro'ect would p � have 20 bene <br />- originally shown on the preliminary roll. fitted sites not 19 as <br />Jeff Barton, Assistant Director Utility Services, advised <br />that staff met with these people on the evening of December 27 to <br />discuss the entire project and inform them of the timeframe. The <br />purpose of this first Public Hearing on the proposed projects is <br />to get the public's input, and if the Board decides to proceed <br />another Public Hearing is then scheduled. A tentative date of <br />February 10th has been proposed in order to do all the necessary <br />29LJAN ti •�s <br />13 11987 BOOK U0 I11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.