My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/20/1987
CBCC
>
Meetings
>
1980's
>
1987
>
1/20/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:34:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/20/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 2 0 'W7 <br />BOOR �� F"9u <br />Director Davis explained that when the Boulevard was <br />designed originally, the Utility Department was in the process of <br />having their master plan for water and sewer facilities prepared. <br />Now that it is complete, there is some better direction as to <br />what sleeves we want under the Boulevard to facilitate the water <br />and sewer lines. In order not to hold up the project, staff <br />would like authorization to work with the contractor to accom- <br />plish these changes for the water and sewer sleeves and then <br />bring back Change Order #3 to cover that. In the meantime, <br />Change Order #2 needs approval. That $14,000 is related to <br />roadwork and funded by Road 6 Bridge. The other $18,000 is <br />actually utility work and funded by water and sewer impact fees. <br />Chairman Scurlock felt the lineal foot price for the PVC <br />pipe was high, and Director Davis agreed that even though this <br />had been reduced somewhat, it still is a bit high, but he did <br />feel the contractor gave us a good price on the excavation and <br />outfall channel. <br />Commissioner Wheeler wished to know if there is any problem <br />with using gas tax money for irrigation, and Director Davis did <br />not feel so because part of a roadway project concerns drainage, <br />grass, etc.; water quality is a requirement of the DER, and we <br />have to filter the storm water run-off. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously <br />approved Change Order #2, Indian River Boule- <br />vard South Extension in the amount of $14,625; <br />authorized the signature of the Chairman; and <br />also authorized staff to negotiate with the <br />contractor re the water and sewer sleeves as <br />discussed. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.