Laserfiche WebLink
TO: BOARD OF COUNTY COMMISSIONERS DATE: JANUARY 12, 1987 <br />THRU: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />VIA: TERRANCE G. PINTO r'r <br />DIRECTOR OF UTILI S RV`10ES <br />FROM: JEFFREY A. BOONE <br />ENGINEERING OPERATIONS MANAGER <br />SUBJECT: GRAVITY WASTEWATER COLLECTION SYSTEM FROM 12TH STREET TO <br />11TH STREET ON 7TH COURT AND FROM 7TH COURT TO 6TH AVENUE <br />ON 11TH STREET. PROJECT #US86-17-CS <br />On May 14, 1986, the Board of County Commissioners approved the design <br />of a regional lift station amounting to $5,400.00 and corresponding <br />construction costs equaling $60,600.00 for a total project cost of <br />$66,000.00. At the same time, a Developers Agreement in the amount of <br />$13,500.00 with Vatland Oldsmobile was approved, which included the <br />payment to the County of $5,000.00 in impact fees and $8,500.00 as <br />contribution in aid of construction. <br />Since that time, Masteller and Moler Associates, Inc., our consultants <br />on the project, recommended that a gravity collection system could be <br />constructed for approximately the same cost of a lift station and <br />force main. <br />The Division of Utility Services then proceeded on that basis and on <br />November 24, 1986 bids for the subject gravity collection system were <br />received. <br />Following is an outline of the bids: <br />1. Collee Mechanical, Inc. $60,573.00 <br />2. JoBear Inc. $77,100.25 <br />ANALYSIS•13. Coastline Utilities, Inc. $77,720.72 <br />The original budget estimate for construction costs, as prepared by <br />Masteller and Moler Associates, Inc., was $60,000.00 for the regional <br />lift station and force main. The budget estimate for construction <br />costs for the revised design of the gravity wastewater collection <br />system was $67,000.00. <br />The revised design, calling for the construction of a gravity <br />wastewater collection system, will enable surrounding properties to <br />-connect to the County's wastewater system and thereby afford Vatland- <br />Oldsmobile a reduction of $1,288.00 in the contribution in aid of <br />construction, as outlined in the original Developers Agreement dated <br />May 14, 1986. Similar contributions in aid of construction will be <br />required of the surrounding commercial properties when they connect to <br />the system. <br />RECOMMENDATION: <br />The Division of Utility Services recommends that the Board of County <br />-- Commissioners approve the revised design consisting of the gravity <br />wastewater collection system and, by executing the accompanying <br />contract documents, approve award of the bid to Collee Mechanical, <br />Inc. in the amount of $60,573.00 for the subject construction. <br />Furthermore, the Division of Utility Services recommends that the <br />Board of County Commissioners approve the reduction of $1,288.00 in <br />contribution in aid of construction from $8,500.00 to $7,212.00 as <br />outlined in the Developers Agreement with Vatland Oldsmobile dated May <br />14, 1986. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, unanimously approved the revised <br />design as described above; approved award of the bid <br />to Collee Mechanical, Inc., in the amount of $60,573; <br />AN 0 1987 BoaK 6 7 ms 47 <br />