My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/3/1987
CBCC
>
Meetings
>
1980's
>
1987
>
2/3/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:42:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/03/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FEB <br />TO: BOARD OF COUNTY COMMISSIONERS DATE: JANUARY 21, 1987 <br />THRU: CHARLES BALCZUN <br />COUNTY ADMINISTRATOR <br />VIA: TERRANCE G. PINTO I V1ifil C - <br />DIRECTOR OF UTILITY SERVICES <br />FROM:,-) JEFFREY K. BARTON <br />,-1 ASSISTANT DIRECTOR OF UTILITY SERVICES <br />SUBJECT: PROPOSED PROJECT AND ASSESSMENT ROLL <br />` SOUTH U.S. #1 (WEST SIDE) <br />BACKGROUND <br />The increased commercial construction on the west side of South U.S. <br />#1 between Oslo Road and the Grove Isle Development makes it <br />necessary for a parallel water line to be constructed on the west <br />side of U.S. #1 rather than getting permits for each development from <br />DOT to jack and bore U.S. #1 to reach the water line on the east side <br />of U.S. #1. The special requirements of DOT and the cost of a jack <br />and bore costs between $3,000 and $5,000 each time a road crossing is <br />done. The proposed project will make water available to all property <br />owners on the west side of U.S. #1. <br />The enclosed materials from Masteller.& Moler Associates, Inc. show a <br />proposed construction cost of $89,000.00, plus engineering fees of <br />$8,550.00, for a total proposed project cost of $97,550.00. <br />This cost would be recovered by an assessment roll of the <br />properties fronting on the west side of South U.S. #1. <br />RECOMMENDATION <br />The Division of Utility Services recommends that the Board of County <br />Commissioners approve the following: <br />_ A. Authorize the Division of Utility Services staff to proceed with <br />an involuntary assessment roll of benefitted owners on South <br />U.S. #1. <br />B. Approve Work Authorization #11 with Masteller & Moler <br />Associates, Inc. to proceed with the engineering for the <br />proposed South U.S. #1 project. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Bird, the Board unanimously authorized <br />staff to proceed with an involuntary assessment roll <br />of benefited owners and approved Work Authorization <br />#11 for Masteller & Moler to proceed with the en- <br />gineering for the project. <br />28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.