Laserfiche WebLink
FEB 10 1987 Boos 67 rAc R <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Wheeler, the Board unanimously adopted <br />th preliminary assessment roll for water improvements <br />in Seminole Shores Subdivision. <br />St. Christopher Harbor Water Assessment Roll <br />The Board reviewed the following assessment costs: <br />ST. CHRISTOPHER HARBOR <br />Contract C-110 Sec. "B" <br />WATER ASSESSMENT ROLL <br />Construction $ 39,611.00 <br />Engineering 11.6% $ 4,594.88 <br />Assessment Roll $ 150.00 <br />Field Inspection 4.0% $ 1,584.44 <br />Field Staking & Testing 2.5% $ 990.28 <br />Contingencies 10% $ 3,961.10 <br />TOTAL: $ 50,891.70 <br />Assessment/Lot <br />(Based on 14 Lots) $ 3,635.12 <br />EXHIBIT "A" <br />Chairman Scurlock opened the Public Hearing, and asked if <br />anyone wished to be heard in this matter. There being none, the <br />Chairman declared the Public Hearing closed. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Wheeler, the Board unanimously adopted <br />the preliminary assessment roll for water improvements <br />in St. Christopher Harbor Subdivision. <br />36 <br />� � i <br />