My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/10/1987
CBCC
>
Meetings
>
1980's
>
1987
>
3/10/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:17 AM
Creation date
6/12/2015 1:46:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/10/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br />COUNTY LANDFILL AND COLLECTION CENTER IMPROVEMENTS <br />The Board reviewed the following memo dated 3/2/87: <br />TO: BOARD OF COUNTY COMMISSIONERS DATE: MARCH 2, 1987 <br />THRU: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR r <br />VIA: TERRANCE-G. PINTO l <br />DIRECTOR OF UTILITY SERVICES <br />FROM: JEFFREY A. BOONE <br />ENGINEERING OPERATI NS MANAGER <br />DIVISION OF UTILITY SERVICES <br />SUBJECT: COUNTY LANDFILL AND COLLECTION CENTER IMPROVEMENTS <br />BACKGROUND AND INFORMATION <br />As you know, the Division of Utility Services has retained Camp <br />Dresser & McKee, Inc. (CDM) to perform a solid waste rate study, a <br />solid waste master plan, as well as, a septage and sludge report. The <br />results of the studies were presented to you for your consideration on <br />February 2, 1987. During that presentation, both Utilities Division <br />staff and representatives of CDM expressed concern over the amount of <br />available disposal capacity in Phase I of the landfill. Attached for <br />your review and approval are Exhibit A -Scope of Work, Exhibit B - <br />Project Labor Breakdown, and Exhibit C -Project Budget as submitted by <br />CDM. <br />T T.TAT VQ TO <br />Due to the extended lead time required for design and construction, <br />the Division of Utility Services has already negotiated fees for <br />design of the required solid waste system improvements with CDM. The <br />engineering fees associated with subject project have been limited to <br />$237,100.00 with an estimated duration of six (6) months for design. <br />RECOMMENDATION <br />The Division of Utility Services recommends that the Board of County <br />Commissioners approve and thereby authorize CDM to perform the subject <br />engineering for $237,100.00. A formal work authorization outlining <br />the agreement is forthcoming for your signature. <br />Chairman Scurlock understood that this is not the total for <br />engineering fees that will be necessary to fully complete the <br />project. <br />Jeff Boone of Utility Services advised that this will <br />effectively gain the permitting, design and bid documents. There <br />are some other items that are so far down the road the costs <br />cannot be projected at this time, and those will have to be <br />brought to back to the Board under a separate work authorization. <br />70 <br />0 1987 <br />j'�R BOOK F'L'UE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.