My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/14/1987
CBCC
>
Meetings
>
1980's
>
1987
>
4/14/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:18 AM
Creation date
6/12/2015 1:30:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/14/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be expected for a 1979 model; however, they will be looking for <br />replacement in two years. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously authorized <br />the expenditure of $14,351.55 to Florida Equipment and <br />Service, Inc. to replace the lugs on all four wheels of <br />the Caterpillar 816B, as recommended by staff. <br />L.' Cables Between Administration Center and Courthouse <br />The Board reviewed the following memo dated 3/30/87: <br />TO: Edwin M. Fry, Jr. DATE: March 30, 1987 FILE: <br />Finance Director <br />SUBJECT: Cables between Administration <br />Center and Courthouse. <br />FROM:Don Hylton,REFERENCES: <br />Director of nformation Systems <br />After receiving approval from the Board to install fiberoptic cables between <br />the Courthouse and the Administration Center, I contacted the vendor who had <br />given me the quote for the turnkey installation to tell them to procede with <br />the installation. Two days later I receive a call telling me they had made <br />a mistake in their bid and could not comply with the quote given. The mistake <br />amounted to over $9,000.00 higher than what was approved. <br />At this higher cost, the fiberoptic method would not be cost effective, so <br />I recommend that we go with the moving of our current cables at a cost of <br />$4,000.00 and make additions as needed. <br />Lam' <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the recommendation of staff to go with the moving of <br />our current cables at a cost of $4,000 and make <br />additions as needed, instead of installing fiberoptic <br />cables at a cost of $15,200, as previously approved at <br />the meeting of 3/24/87. <br />
The URL can be used to link to this page
Your browser does not support the video tag.