My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/2/1987
CBCC
>
Meetings
>
1980's
>
1987
>
6/2/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:36:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/02/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN 2 '987 <br />43RD,AVENUE TRAFFIC OPERATION PLAN <br />BOOK 68 oa 471 <br />Public Works Director Davis reviewed the following memo, <br />noting that the 43rd Avenue Traffic Operation Plan was <br />distributed to the Board and accepted by the Board at the meeting <br />of May 19th: <br />TO: The Honorable Members of the DATE: May 20, 1987 FILE: <br />Board of County Cam<nissioners <br />THROUGH: <br />Charles P. Balczun, <br />County Administrator SUBJECT' <br />•- 43rd Avenue Traffic <br />James W. Davis, P.E., Operation Plan <br />Public Works Director <br />FROM'chael L. Orr,OP <br />REFERENCES: <br />Traffic Engineer <br />DESCRIPTION OF CONDITIONS <br />A study was conducted by staff in response to (1) traffic accidents at the <br />intersections of 43rd Avenue/8th Street and 43rd Avenue/26th Street, and <br />(2) complaints about speeding on 43rd Avenue between 4th Street and State <br />Road 60. <br />The subject report was presented to the Transportation Planning Committee <br />on May 13, 1987, which subsequently recommended approval. Various improve- <br />ments are recommended between 1987 and 2000 to increase safety and/or <br />capacity on 43rd Avenue and at major intersections. These improvements, <br />cost, staging and funding source are summarized in Table 3 (page 41) of the <br />subject report. <br />Projects recommended in the report to be added to the Transportation <br />Improvement Program during the current 1985-1990 stage are: <br />Traffic Signal 43rd Avenue/45th Street $30,000 <br />Left -turn Lanes 43rd Avenue/41st Street $130,000 <br />Traffic Signal 43rd Avenue/26th Street $30,000 <br />Traffic Signal 43rd. Avenue/12th Street $30,000 <br />ALTERNATIVES AND ANALYSIS <br />(1) Approve the 43rd Avenue Traffic Operations Plan and add the <br />aforementioned four projects to the Transportation Improvement <br />Program. <br />(2) Select other roadway improvement projects to add to the Transporta- <br />tion Program. <br />(3) Do not approve the 43rd Avenue Traffic Operations Plan and do not add <br />projects to the Transportation Improvement Program. <br />RECON]N=ATION AND FUNDING <br />Alternative #1 is recommended to increase safety and/or capacity at the <br />four intersections. Funding is available through Traffic Impact' fees <br />and/or gas tax revenue <br />Attachment: 43rd Avenue Traffic Operation Plan <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.