My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/1987
CBCC
>
Meetings
>
1980's
>
1987
>
6/16/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:38:53 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/16/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Eggert wished to know if Mr. Dean was recom- <br />mending the 11 days, and he confirmed that he was. <br />Further discussion ensued regarding just how the records are <br />kept,,with Commissioner Eggert inquiring whether anyone besides <br />the architect's representative keeps these records. <br />Mr. Dean stated that the only record is just what the repre- <br />sentative on the job site keeps and we have that documented; he <br />assured the Board that a careful record has been kept. <br />ON MOTION by Commissioner Bird, SECONDED by Com- <br />missioner Eggert, the Board unanimously (4-0) <br />approved I.R.C.Jail, Phase 11 - Change #4 with <br />Schopke Const. for $2,738. <br />1878 <br />FRIZZELL ARCHITECTS OWNER 0 <br />ARCHITECT ❑ <br />CHANGE ORDER CONTRACTOR ❑ <br />FIELD ❑ <br />OTHER <br />PROJECT: INDIAN RIVER COUNTY JAIL - CHANGE ORDER NO: Four ( 4 ) <br />(name, address) PHASE II <br />OWNER: BOARD OF COUNTY COMMISSIONERS, <br />INDIAN RIVER COUNTY <br />TO: (Contractor) <br />n SCHOPKE CONST. & ENG., INC. -1 <br />1620 Tangerine Street <br />Melbourne, F1. 32901 <br />L <br />DATE: May 22, 1987 <br />ARCHITECT'S PROJECT NO: 1878 <br />CONTRACT FOR: General Construction <br />CONTRACT DATED: May 2 8 ,19 8 6 <br />J <br />YOU ARE HEREBY AUTHOVIZED TO MAKE THE FOLLOWING CHANGES IN THE SUBJECT JOB: <br />1. Add thru-wall drains at second floor Rooms 137, 138, <br />139, 140, 141 in accordance with Proposal Request <br />Two (2), Item 10 dated March 24,1987. (See Schopke <br />April 13, 1987 (modified) and April 24, 1.987) <br />2. Modify door frame #15 due to concrete slab being <br />lower than anticipated on plans. (Cost of $954.00 <br />deferred and paid by Architect). <br />3. Extend contract time 2 days for weather occuring <br />12/23/86 & 12/27/86 (See WRF 2/26/87, 2/27/87 <br />and IRCO 3/5/87). Extend contract time 2 days <br />for weather occuring 3/7/87 & 3/28/87 (See <br />WRF 4/2/87, 4/2/87 and IRCO 4/8/87. Extend <br />Contract time for additional work, seven (7) days. <br />11 <br />JUN 16 1987 <br />TOTAL <br />nrmirm <br />BOOR <br />t��U <br />
The URL can be used to link to this page
Your browser does not support the video tag.