My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1987
CBCC
>
Meetings
>
1980's
>
1987
>
7/7/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:41:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/07/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AL 71987 8m.. ,�;_ .13 <br />PROJECT: CHANGE ORDER NUMBER: Three (3 ) <br />(name, address) <br />INI11Afl()N DATE: 6/24/87 <br />TO (Contractor): <br />F ARCHITECT'S PROJECT NO: 8430 <br />Dickerson Florida, Inc. CONTRACT FO R: <br />P.O. Drawer 719 Road Widening <br />Stuart, Florida 33495 <br />L J CONTRACT DATE: December 16, 1986 <br />You are directed to make the following changes In this Contract: <br />Bid Item #425-8 <br />Adjust eleven water valve boxes @ $65.00 each for a <br />total of $715.00 as per instruction from Director of <br />Public Works. <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) (QDw=1=(k :#xt{tMWX;C..XW was ........................... $ 3§2,457.80 <br />Net chinge.by previously authorized Change Orders ................................ $ 2160.00 ' <br />The (Contract Sum) (ZKXa=e1t*M1d=w)6o3dkprior to this Change Order was .......... $ 394,617.80 <br />The (Contract Sum) will be (increased) (4#)x(lg <br />bythis Change Order......................................................... $ 715.00 <br />The new (Contract Sum) QW$d including this Change Order will be ... S 395,332.80 <br />The Contract Time will be NixisX29 I epMXA) (unchanged) by ( ) Days. <br />The Date of Substantial Completion as of the date of Ibis Change Order therefore is Same <br />Indian Ri <br />A 184T0t T25th Street <br />Address <br />Vprn RpAr'h,F1 nr i rlq .32260 <br />8Y .� <br />alph N. 8rescia, P.E <br />DATE <br />Authorized: <br />Dickerson Fl ori da Inn __ -Indian ie_Cb=ty <br />CC)NTRAt OR U NER <br />P.O. Drawer 719 1140 25th S-treet_ <br />Ad s Address <br />tit <br />AIA DOCUMENT G791 • CHANUE ORUER A <br />THE AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW <br />2960 <br />jD30 $h -ItAU Don C. ScurlooJr. <br />T <br />1978 t0I110N • AIA• • u Pl'n <br />C AVE.. N.W., WASHINWUN, U.(. 114Nb 6701-1978 <br />WORK AUTHORIZATION #14 - ADDITIONAL ENGINEERING COSTS FOR <br />CONNECTION OF NORTH AND SOUTH WATER SYSTEMS <br />_The Board reviewed the following memo dated 6/29/87: <br />52 <br />01strlUtillon tu: <br />ORDER <br />UV%NtR <br />AkCHII ECI <br />C7 <br />AIA 00C1J&J1N7 G701 <br />CONTRACTOR <br />CJ <br />I IEI U <br />1.1 <br />c)1IILK <br />L.J <br />PROJECT: CHANGE ORDER NUMBER: Three (3 ) <br />(name, address) <br />INI11Afl()N DATE: 6/24/87 <br />TO (Contractor): <br />F ARCHITECT'S PROJECT NO: 8430 <br />Dickerson Florida, Inc. CONTRACT FO R: <br />P.O. Drawer 719 Road Widening <br />Stuart, Florida 33495 <br />L J CONTRACT DATE: December 16, 1986 <br />You are directed to make the following changes In this Contract: <br />Bid Item #425-8 <br />Adjust eleven water valve boxes @ $65.00 each for a <br />total of $715.00 as per instruction from Director of <br />Public Works. <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) (QDw=1=(k :#xt{tMWX;C..XW was ........................... $ 3§2,457.80 <br />Net chinge.by previously authorized Change Orders ................................ $ 2160.00 ' <br />The (Contract Sum) (ZKXa=e1t*M1d=w)6o3dkprior to this Change Order was .......... $ 394,617.80 <br />The (Contract Sum) will be (increased) (4#)x(lg <br />bythis Change Order......................................................... $ 715.00 <br />The new (Contract Sum) QW$d including this Change Order will be ... S 395,332.80 <br />The Contract Time will be NixisX29 I epMXA) (unchanged) by ( ) Days. <br />The Date of Substantial Completion as of the date of Ibis Change Order therefore is Same <br />Indian Ri <br />A 184T0t T25th Street <br />Address <br />Vprn RpAr'h,F1 nr i rlq .32260 <br />8Y .� <br />alph N. 8rescia, P.E <br />DATE <br />Authorized: <br />Dickerson Fl ori da Inn __ -Indian ie_Cb=ty <br />CC)NTRAt OR U NER <br />P.O. Drawer 719 1140 25th S-treet_ <br />Ad s Address <br />tit <br />AIA DOCUMENT G791 • CHANUE ORUER A <br />THE AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW <br />2960 <br />jD30 $h -ItAU Don C. ScurlooJr. <br />T <br />1978 t0I110N • AIA• • u Pl'n <br />C AVE.. N.W., WASHINWUN, U.(. 114Nb 6701-1978 <br />WORK AUTHORIZATION #14 - ADDITIONAL ENGINEERING COSTS FOR <br />CONNECTION OF NORTH AND SOUTH WATER SYSTEMS <br />_The Board reviewed the following memo dated 6/29/87: <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.