My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/18/1987
CBCC
>
Meetings
>
1980's
>
1987
>
8/18/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:52:04 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/18/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Deputy Sheriff Appointment <br />ON MOTION by Commissioner Bird, SECONDED by Com- <br />missioner Bowman, the Board unanimously (4-0) <br />approved the appointment of Deputy Sheriff Glenn D. <br />Fraser by Sheriff Dobeck. <br />C. Reports <br />The following was received and placed on file in the Office <br />of Clerk to the Board: <br />Florida Department of Corrections Inspection Report, <br />County and Municipal Detention Facilities, <br />2nd Annual Routine Inspection, Indian River County <br />Jail, July 7, 1987. <br />D. West Regional WW Treatment Plant - Temp Lab/Shop Bldg. <br />The Board reviewed memo of Engineering Manager Boone: <br />TO: BOARD OF COUNTY CWYE <br />ERS DATE: JULY 28, 1987 <br />THRU: TERRANCE G. PINTO <br />DIRECTOR OF UTILIES <br />FROM: JEFFREY A. BOONE't <br />ENGINEERING OPERATIONS MANAGER <br />DIVISION OF UTILITY SERVICES <br />SUBJECT: WEST REGIONAL WASTE WATER TREATMENT PLANT - TEMPORARY <br />LAB/SHOP BUILDING <br />BACKGROUND <br />Phase 'I of the County's West Regional Wastewater Treatment Plant <br />(WRWWTP) did not included the construction of laboratory, shop or <br />bathroom. It is imperative that the operators have bathroom <br />facilities to change clothes and shower, after coming in contact <br />with sludge or sewer. A permanent structure is planned for Phase II <br />but is -as much as three years.away, depending on the growth rate and <br />corresponding demand for wastewater capacity in the west County <br />area. <br />At the present time the plants operating staff is forced to perform <br />all laboratory analysis and conduct all business in the plants <br />blower room, which being an industrial environment has no noise or <br />temperature control. Furthermore, the plant is not equipped with <br />adequate facilities to ensure the safety of the operators with <br />respect to providing the required emergency shower, toilets, and <br />eyewash stations. <br />3 BOOK M FP:GE 84 <br />
The URL can be used to link to this page
Your browser does not support the video tag.