Laserfiche WebLink
Fr'_ 4 IS jl'�5 7 <br />$'OAK c+� rA.C166 <br />Mr. Munksgaard advised that he would be assisted by Brian <br />Graham, their engineer in the Vero Beach office, in discussing <br />some of the recommendations contained in the Master Plan and the <br />requirements for pursuing Federal funding for a sludge/septage <br />disposal system. Messrs. Munksgaard and Graham gave a general <br />overview of the scope of the Master Plan, followed by a slidefilm <br />_,presentation. Inserted below are copies of several of the <br />slides. The first slide shows the location of some 70-75 <br />existing treatment facilities in the county. CDM has identified <br />two new systems, the West Central system and the North system, <br />and divided the area into 6 systems: West, West Central, North, <br />South, City of Vero Beach, and Central. <br />37 <br />