My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/25/1987
CBCC
>
Meetings
>
1980's
>
1987
>
8/25/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:59:19 AM
Creation date
6/12/2015 1:52:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/25/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
77, <br />I = <br />1) Add 3-42' long concrete traffic signal poles to the contract resulting <br />in an additional cost of $5,500. This change was necessary due to the <br />poles being placed in a deep swale along the Boulevard at 12th Street <br />and 8th Street. <br />2) Add 100 LF of storm drainage pipe along the south side of 8th Street <br />east of 6th Avenue. This change.Js required due to the recent level- <br />optnent of the Citrus Woods project south of 8th Street. The Citrus <br />Woods site was -filled after the 8th Street work was designed causing <br />unforeseen grade problems iii this area: An additional cost of $5,280 <br />is requested. �. r <br />3) A total of 19 days tine•extension has been negotiated for this work. <br />The contractor is also requesting 18 days time extension for water -and. _ <br />sewer utility sleeve work approved under an earlier change order. <br />The total change order increases, the contract by -$10,780 and provides for <br />37.days time extension. <br />The contractor has requested the following conditions if .the South Exten- <br />sion of the Boulevard is to be opened in September, 1987. <br />(1) Define the - exact Limits of partial project acceptance - staff <br />;'... r., recamiends that ttie limits be, established as follows - Indian <br />River Boulevard from 4th Street to.17th Street including the US <br />1/Indian River Boulevard intersection. <br />(2) The accepted portion of the work as defined in. (1) above be <br />considered totally complete as defined by the contract. - <br />(3) Immediately upon open to traffic, all liability for the portion <br />of the road opened would be borne by the County. <br />(4) The warranty for the work on the portion opened would ccaimence <br />September 1, 1987. <br />(5) The 10% retainage on the project would be released to the <br />contractor for the portion of the Boulevard when the road is <br />opened to traffic. <br />MEMATIVE.S AND ANALYSIS <br />Staff has reviewed Change Order No. 9 and the five conditions requested by <br />the Contractor regarding the opening of Indian River Boulevard South <br />Extension. The Change Order costs and the above conditions are- reasonable. <br />I <br />REdONMIDATIONS AVID FUNDING <br />Staff recommends approval of Change Order No. 9 and that the five con- <br />ditions above be approved regarding the opening of Indian River Boulevard <br />to ''traffic. <br />Funding to be from Gas Tax Revenue, Fund 304, Indian River Boulevard South. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />staff's recommendation as set out in the above memo. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.