My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/15/1987
CBCC
>
Meetings
>
1980's
>
1987
>
9/15/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2018 9:43:48 AM
Creation date
6/12/2015 1:57:37 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/15/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The foregoing resolution was offered by Commissioner <br />Eggert , who moved its adoption. The motion was <br />seconded by Commissioner Bird , and upon being <br />put to vote, the vote was as follows: <br />Chairman Don C. Scurlock, Jr. Aye <br />Vice Chairman Margaret C. Bowman Aye <br />Commissioner Richard N. Bird Aye <br />Commissioner Carolyn Eggert Aye <br />Commissioner Gary Wheeler Aye <br />The Chairman thereupon declared the resolution duly passed and <br />adopted this 15th day of September , 1987. <br />ATTEST: <br />Wright; C�le <br />(J <br />BOARD OF COUNTY COMMISSIONERS <br />OF INDIAN RIVER COUNTY, FLORIDA <br />By: e. <br />Don C. Scu ock, Jr., firman <br />`.� INDIAN RIVER COUNTY <br />Date: June 21, 1987. Work Authorization No. 15 for Consulting Services <br />Project No. 15 County) (Masteller & Moler Associates, Inc.)(WATER) <br />I. PROJECT DESCRIPTION <br />Title: Potable Water Main on 47th Avenue in Glendale Lakes Subdivision. <br />Consulting engineering design services relative to construction of <br />approximately 500 linear feet of 8" diameter water main from 48th Avenue <br />and 9th Place, east along 9th Place to 47th Avenue, and approximately <br />1200 linear feet of 6" diameter water main south along 47th ..Avenue to <br />point of connection with an existing water main at 48th Avenue. The <br />project will _include construction of fire hydrants, valves, and <br />appurtenances. Construction cost estimate for the project, including 10% <br />contingency, is $35,365.00. <br />II. SCOPE OF SERVICES AND LUMP SUM FEE FOR SERVICES <br />Reference is made to the "Agreement for Professional Services" dated July <br />2, 1986, and specific Article numbers and paragraph numbers which are <br />listed hereunder to describe the scope of services included on this <br />project. <br />A. Project Desian Services per Article 4, Paragraph 4a. and 4b. <br />B. General Services During Construction per Article 5, Paragraph 5a., <br />and 5c. <br />The Resident Inspector shall be a full-time employee of the <br />Engineering Consultant. The Resident Inspector's duties shall be to <br />monitor construction on a continuous basis and be at the jobsite when <br />project construction is taking place. - <br />19 <br />ROOK PAGE' <br />
The URL can be used to link to this page
Your browser does not support the video tag.