Laserfiche WebLink
r- OCT 6 1W7 <br />Davis Construction - Vero Beach <br />9' <br />x 21' <br />- Double Wall <br />9' <br />x 21' <br />- Single Wall <br />8' <br />x 21' <br />- Double Wall <br />8' <br />x 21' <br />- Single Wall <br />7' <br />x 5' <br />- Double Wall <br />7' <br />x 5' <br />- Single Wall <br />5' <br />x 7' <br />- Double Wall <br />5' <br />x 7' <br />- Single Wall <br />RECOMMENDATIONS AND FUNDING <br />$ 2,590 <br />$ 1,960 <br />$ 2,415 <br />$ 1,820 <br />$ 525 <br />$ 420 <br />$ 595 <br />$ 455 <br />BOOK 69 PAGE 692 <br />Staff recommends awarding the bid to Davis Construction, Vero Beach, as the <br />lowest and best bid. <br />Funding to be from Petition Paving Fund 703 or Road & Bridge Fund 111-214 <br />as needed. <br />Commissioner Eggert was surprised there was just one bid and <br />wondered if that was usual. <br />Director Davis advised that it is normal on this particular <br />type work. Davis Construction is really the only rip rap company <br />he knows of in town. <br />ON MOTION by Commissioner Eggert, SECONDED by Commis- <br />sioner Bird, the Board unanimously (4-0) awarded Bid <br />#359, the annual contract for Straight Sand Cement <br />Endwalls, to Davis Construction, Vero Beach, at the <br />prices set out above. <br />M. Bid #361 - Annual Contract Reinforced Concrete Pipe <br />The Board reviewed memo of the Public Works Director: <br />1* <br />14 <br />