My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/5/1988
CBCC
>
Meetings
>
1980's
>
1988
>
01/5/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:15:40 AM
Creation date
6/12/2015 2:00:17 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/05/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN 5 1988 <br />BOOK .70 PAGE 479 <br />F <br />aludl@yoaouw <br />ATTAC[IlP W <br />MANGE ORDER M. 12 <br />12TR SHIM' TRAFFIC & PEDESTRIAN IMPROMMENTS <br />F�'11i IlWN RIVER B 1JI VARD, scummy =MICK <br />EXPLANATION AND COST <br />1. The contractor has requested an extension of 26 calendar days in the <br />contract time due to delays associated with Southern Bell Telephone <br />Company's modification of cable systems (12 days) and FEC RR delay in <br />construction of the railroad crossing at 12th Street (14 days). <br />2. During construction of 12th Street it was noted by the contractor that <br />the level of the railroad track had been raised by the F.E.C. <br />construction crews. This level change resulted in profile changes in <br />the 12th Street roadway and the enclosed letter from Dickerson Florida <br />(dated December 10, 1987) itemizes the associated costs. <br />Lump Sum Tbtal Cost $ 2,324.50 <br />3. The County requested a change in the type of loop detectors to be <br />installed on the remaining intersection to be signalized. The attached <br />letter from Mr. Jim Davis, dated December 10, 1987, itemized the <br />intersections included. <br />Bid Item No. 660-2-101 Loop Assembly Type "A" <br />From: 73 AS <br />To: 33 AS <br />- 40 AS <br />$276.25/AS = (-) $11,050.00 <br />Bid Item No. 660-2-106 Imp Assembly Type "F" <br />From: -0- AS <br />To; + 40 AS <br />+ 40 As @ $376.25/AS = $15,050.00 <br />Net Increase This Chime Order: $ 6325.50 <br />+ 26 days <br />F. Release of Easement - Artz Request - Vero Shores Subdivision, <br />Block 9, Lot 14 <br />The Board reviewed the following memo dated 12/2/87: <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.