My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/19/1988
CBCC
>
Meetings
>
1980's
>
1988
>
1/19/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:17:58 AM
Creation date
6/12/2015 2:02:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/19/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IMO <br />Activity/Task <br />ATTACHMENT A I <br />Amendment No. 2 to the <br />AGREEMENT <br />Modifications and Additions to Plans <br />Indian River Boulevard North Extension <br />A B C D Total Direct <br />Roadway Plans <br />I.) Acceleration Lane <br />Revision <br />2.) Left Turn Lane <br />Revision <br />3.) Extend Frontage <br />Road <br />4.) Add Right Turn <br />Lane @ Barber <br />5.) Add Left Turn <br />Lane @ Barber <br />6.) Revise Frontage <br />Road <br />.7.) General Admin <br />Coord & Quality <br />Control <br />8 <br />8 <br />4 <br />3 <br />7 <br />5 <br />5 <br />10 14 <br />16 18 <br />3 $80 (Repro) <br />Total MH 8 49 56 3 <br />Rate 27.00 16.00 8.40 8.10 <br />Cost $216 $784 $470 $24 $1494 $80 <br />Wages 1494 x 2.55 = $3,810 <br />Total "Cost" 3,890 <br />Fixed Fee II% 428 <br />Cost Plus Fixed Fee $4,318 <br />Boyle Engineering Corporation <br />OR -105-103-00 <br />C.M. Green, Project Manager <br />C9AN 1 e 19@ <br />13 BOOK 70 PAGE 573 <br />
The URL can be used to link to this page
Your browser does not support the video tag.