My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/26/1988
CBCC
>
Meetings
>
1980's
>
1988
>
1/26/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:19:10 AM
Creation date
6/12/2015 2:03:32 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/26/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTERNATIVES AND ANALYSIS <br />The changes reflected in Change Order No. 2 were recommended by the <br />consulting engineer, Lloyd and Associates, in the field. Staff concurs <br />that the work was necessary. <br />RECOMMENDATION AND FUNDING <br />Staff recommends approval of Change Order No. 2. Funding to be frac Zone 6 <br />Traffic Impact fees (Balance as of 1/13/88 was $194,352.16.) <br />Public Works Director Jim Davis noted that the work was <br />necessary because without the additional asphalt, the road would <br />not have drained properly. <br />Commissioner Eggert asked about the status of the traffic <br />signal, and Director Davis advised that the contract execution <br />should be completed this week and Signal Construction should be <br />building the signal within the next 30 days. Hopefully, it will <br />be installed by March ist. <br />JAN 2 6 1988 <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />Change Order #2 increasing the contract amount with <br />Dennis L. Smith, Inc., by $4,778.31 for miscellaneous <br />intersection improvements at Oslo Road and U.S. #1, as <br />recommended by staff. <br />49 <br />BOOK 70 FACE 707 <br />
The URL can be used to link to this page
Your browser does not support the video tag.