My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/22/1988
CBCC
>
Meetings
>
1980's
>
1988
>
3/22/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:40:49 AM
Creation date
6/12/2015 2:10:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/22/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Commissioner Eggert asked the amount of the projected <br />construction cost, and Projects Engineer Bill McCain estimated it <br />at $2.1 million for the general construction contract; somewhere <br />in the ballpark of $120,000 for the degasifier portion of it, and <br />somewhere in the neighborhood of $60,000-$70,000 for the extra <br />well that will be added. He felt we were looking at a rough <br />total of $2.6 million. <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Eggert, the Board unanimously approved <br />Work Authorizations #06a, #18, and #07a with DSS <br />Engineers, Inc. as set out in the above memo, as <br />recommended by staff. <br />38 <br />MAR 2 2 1988 <br />BOOK 71 FACE 337 <br />
The URL can be used to link to this page
Your browser does not support the video tag.