My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/22/1988
CBCC
>
Meetings
>
1980's
>
1988
>
3/22/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:40:49 AM
Creation date
6/12/2015 2:10:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/22/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Phase I final plat area consists of POD H (Harmony Island),, <br />POD P (Wood Duck Island), as well as future recreational and <br />clubhouse area, rights-of-way, open areas and waterbodies. The <br />two PODS (H & P) consist of approximately 26 acres with 250 <br />dwelling units which results in an overall density of 2.07 units <br />per acre. <br />The subject property is zoned RM -6 (Multi -Family Residential, up <br />to 6 units/acre) and has an MD -1 (Medium Density Residential, up <br />to 8 units/acre) land use designation. At its regular meeting of <br />October 9, 1986, the Planning and Zoning Commission granted <br />preliminary PRD plan approval for Phase I of the Grand Harbor <br />project. <br />The owners, Grand Harbor, Inc., are now requesting that final plat <br />approval be granted to the Grand Harbor Phase I plat with the <br />understanding that the developer, shall, prior to final plat <br />approval being given by the Board of County Commissioners at its <br />meeting of March 22, 1988: <br />1. submit an approved letter of credit guaranteeing the contract <br />for construction of required improvements; and <br />2. shall obtain a DOT permit for road improvements constructed <br />across a DOT drainage right-of-way. <br />As of March 14, 1988, the developer has submitted: <br />1. a final plat, substantially in conformance with the approved <br />preliminary PRD plan; and <br />2. a contract for construction of the remaining required <br />improvements. <br />ANALYSIS: <br />At the time this item was prepared for the March 22, 1988 Board of <br />County Commissioners meeting, two issues concerning final plat <br />approval remained unresolved. These two items are, as mentioned <br />above, the required submission of an approvable letter of credit, <br />guaranteeing the contract for construction of required improve- <br />ments and the issue of DOT right-of-way conflict. In order to <br />keep on schedule, the developers have requested that the Phase I <br />plat be allowed to remain on the March 22, 1988 Board meeting <br />provided that both of these outstanding items areresolved prior <br />to the meeting date [see attachment #1]. <br />The required improvements within the Phase I plat boundaries have <br />been substantially finished. Several items do, however, remain <br />unfinished and the developers have submitted certified cost <br />estimates for the remaining improvements and a contract for <br />construction which binds them to complete these improvements in <br />the near future. Both the cost estimates and the contract for <br />future construction have been approved by the Public Works Depart- <br />ment and the county Attorney's office, respectively, and meet all <br />subdivision requirements. <br />All required utility improvements have been inspected and approved <br />by the County Utility Department for the water and sewer system <br />leading to the POD's. Completion of the utility system within <br />each POD will be controlled and approved at the time individual <br />unit C.O.'s are issued. <br />MAR 2 2 1988 <br />BOOK 71 FACE 30G <br />
The URL can be used to link to this page
Your browser does not support the video tag.