My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/5/1988
CBCC
>
Meetings
>
1980's
>
1988
>
4/5/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:49:42 AM
Creation date
6/5/2015 9:26:42 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/05/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 88 - <br />seaward of the County Dune Stabilization Line. Said zone may <br />extend to a line up to fifteen (15) feet seaward of the dune <br />stabilization line but may not extend more than (6t//t/pf//c,b <br />fifteen (15) feet seaward of said 0957itbOX/IVINci!/f/c/r//abbk <br />0¢ bX )6X U00 / /r/e/Va/t/e/c3/ / U/ /c%/r/s/t/rA*/t/i/c%/ / q t/ /i/ dv/We/r/t/W / / Incl / <br />X 710.0AU/b/f//ice'$/0071tt0//dam/. structure. The purpose of the <br />leeway zone is to provide for temporar encroachment of workers <br />and equipment seaward of the Dune Stabilization Line necessary <br />for construction activity. All proposed activity within the <br />fifteen (15) foot leeway zone shall be described in writing and <br />submitted to the Environmental Planner. Such written request <br />for authorization of a leeway zone up to 15 feet in depth shall <br />include a vegetation survey that accurately locates and identi- <br />fies all vegetation within an area between the County Dune <br />Stabilization Setback Line and a line twenty (20) feet seaward <br />of that line as well as a plan for revegetating and maintaining <br />the leeway zone with natural indigenous dune vegetation. No <br />permanent improvement or structure may be made in the leeway <br />zone and, prior to encroachment therein, a temporary barrier <br />running parallel to the Coastal Construction Control Line or <br />County Dune Stabilization Setback Line shall be placed at the <br />most seaward extent of the leeway zone to identify the limits <br />beyond which no encroachment of any kind may occur; provided, <br />however, all activities related to construction of an approved <br />dune crossover or elevated bridge shall be governed by authori- <br />zation t4160A/h/0fix//bA,fAttAW/4'/, Sbbk/. of the Department of <br />Natural Resources, Bureau of Beaches and Shores, or its succes- <br />sor. 444/IpVcric/s/dcY/0¢t4tb4tt//t17i0//f/i/fft-/e/ /f/c%/t//X0000t <br />43vi0 / Abla4/11 /tdgi / 111044)050d/ /i/h/ /1310/ Nlai(/titiad / bb/ /We/ / �f <br />)bat 0)146014U///16/01vfct`// d //i/r/ildrl //r//v/i/e .//4h1//k4144-k 1 fi//,fib//010 <br />A1S15bqS34X /NV /t q'/$Xi ceAxi/,b/f// yid /,8bbhk.,§//)s! 5IZ'e'l /ii}6bt0/ <br />Approvals required under this paragraph may be obtained concur- <br />rently with site plan or subdivision approval, as the case may <br />be, but must be obtained Xyi/,6y//q'v/eh/t prior to the scheduled <br />CODING: Words underlined are additions; 1046/00/0bb/i¢XioitU'4 i <br />APR 51988 <br />6 <br />BOOK 71 DU 4:36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.