Laserfiche WebLink
February 19, 1988 <br />FRIZZELL ARCHITECTS <br />2140 <br />RE: INDIAN RIVER COUNTY JAIL - PHASE 3 <br />ESTIMATED PROBABLE COST OF CONSTRUCTION - SCHEMATIC DESIGN <br />POD "D" 23500 SF @ $ 90 <br />Chases 3150 SF @ $ 45 <br />Connector 1600 SF @ $ 85 <br />Classfication 831 SF @ $ 65 <br />Corridor 185 SF @ $ 65 <br />Prop. Storage 3500 SF @ $ 45 <br />Visitation <br />Control 260 SF @ $ 85. <br />Stair 240 SF @ $100 <br />SUBTOTAL "A" <br />$2,115,000. <br />141, 750. <br />136,000. <br />54,000. <br />12,000. <br />157,500. <br />22,000. <br />24,000. <br />Pre -Book <br />Remodel 860 SF @ $100 86,000. <br />Clinic, Etc. <br />Remodel 1765 SF @ $ 85 150,000. <br />Kitchen 6500 SF @ $ 50 325,000. <br />Kitchen Equipment Lump Sume 200,000. <br />2nd Floor HVAC 2700 SF @ $ 5 13,500. <br />SUBTOTAL <br />Exercise Yard <br />Second Tower <br />nB" <br />Lump Sum - $50,000 <br />Lump Sum - $50,000 <br />$2,662,250. <br />$ 688,500. <br />SUBTOTAL "C" 100.000. <br />TOTAL <br />ADD 15% Contingency + <br />$3,450,750. <br />517,750. <br />$3,968,500. <br />SAY $4,000,000. <br />Mr. Silver explained that the yellow (the unshaded area) <br />represents existing facilities - the square portion, Area <br />IIAft <br />is <br />the administration wing - the octagonal yellow shape is Pod !BI! <br />which is the pod they are repeating and modifying to make Pod <br />"Dn. <br />The other yellow rectangle Area "C" is the second phase <br />which was just completed. Pink (the shaded areas) represents <br />what is proposed, and Blue (the cross -hatched areas) are existing <br />areas that are proposed to be remodeled. Pods "A," "6," and "C" <br />have a capacity of 262 inmates; Pod "D" will bring that capacity <br />just short of 400, and future Pods "E" and "F" will house 400 <br />each for a total future capacity of as many as 1200. <br />27 <br />APR 12 1988 <br />BOOK 72 PAGE 27 <br />