My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/19/1988
CBCC
>
Meetings
>
1980's
>
1988
>
4/19/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:45:15 AM
Creation date
6/12/2015 2:10:41 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANALYSIS <br />Pinkerton <br />Mr. Pinkerton has not participated in design activities to <br />date. Jail Committee members are of the opinion that his <br />services are not required as originally contemplated. Since <br />design activities are essentially completed, it is virtually <br />useless to continue that requirement in the agreement. <br />Buford Goff & Associates <br />This firm would provide professional design services for the <br />Phase III detention electronics system as well as analysis of <br />the existing system to insure they properly interface. <br />Specifically, Goff will provide the following: <br />Alarm Reporting Systems to include reporting of alarm <br />conditions other than those integrated into the security <br />hardware systems. For example, alarms associated with <br />the pharmacy, food service, records, and storage <br />facilities. <br />Closed Circuit Television to include internal and <br />external systems for security. <br />Master Antenna Television Distribution System for phase <br />three addition only. Extension of the existing system <br />into the new facility is anticipated. <br />Public Address/Intercom Systems to support facility <br />functions. <br />Door Locking Control Systems to include logic <br />controllers, console control panels, relay control <br />panels, and conduit/wiring systems. Door hardware and <br />functional descriptions shall be provided by Frizzell or <br />its designated representative. Buford Goff & Associates, <br />Inc. shall be responsible for control circuits and <br />control panels to effect desired operational functions. <br />Consoles shall include design to house systems provided <br />under this section and shall provide coordination for <br />integrating security door control panels into the <br />console. <br />System Integration will include providing interface <br />points to existing security system installed in Phase <br />II. <br />RECOMMENDATION <br />It is recommended that the Board of County Commissioners approve <br />both Supplemental Service Agreements and authorize the Chairman to <br />execute them. <br />Administrator Balczun felt the question is whether we are going <br />to pursue a course in the area of detention electronics where we <br />would provide performance specifications to a manufacturer who <br />would manufacture the equipment of their design to meet our <br />10 <br />APR 19 1988BOO 72 r,tcE <br />
The URL can be used to link to this page
Your browser does not support the video tag.