My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/26/1988
CBCC
>
Meetings
>
1980's
>
1988
>
4/26/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2023 10:47:49 AM
Creation date
6/12/2015 2:13:14 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/26/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S. Revise emergency generator to 75 KW in lieu of 150 KW. <br />6. Delete monitoring wells and reduce size of emergency <br />generator fuel tank. <br />/. Add three electrical feeds to electronic relay cabinet <br />and tie intoexisting circuit breakers. <br />SUB TOTAL <br />S. Add additional cost for tile repairs after 2nd floor <br />drain installation. <br />r <br />9. Liquidated damages; 195 days @ $250.00 per day from <br />April 28, 1987 (contract date plus ten (10) days N.T.P. <br />plus 305 contract days plus twenty (20) days C.O.' <br />extention) to November 9, 1987. <br />10. Reduce liquidated damages to $15,000_.00 due -to Owner/ <br />Contractor negotiated agreement dated November 9, 1987.$33,750.0 <br />U. Added liquidated damages due to contractor not meeting <br />November 18, 1987 substantial completion date, <br />November 18, 1987 through January 14, 1988. (58 days <br />@ $250/day) <br />ADD DEDUCT <br />— 0 - <br />- 0 <br />$242.00 <br />$5,400.00 <br />$1,119.00 <br />- 0 - <br />s 807.00 <br />$(6,808.00) <br />190.00 - 0 <br />- 0 - ($48,750.00) <br />• <br />SUB TOTAL <br />12. Added liquidated damages due to contractor not. <br />meeting February 15, 1988 final completion date._ <br />February 15, 1988 through March 18', 1988 (32 days @ <br />$250/day) . <br />The Contract Time wUi be (piei6bbiaj eYeisDB) (unchanged) by Zero <br />rM <br />- 0 <br />- 0 - ($14,500.00) <br />:34,747.00 (70,058.00) <br />8,000.00` <br />(78,058.00) <br />34,747.00 <br />The Date of Substantia( Completion as of the date of this Change Order therefore Is <br />TOTAL, <br />( -0-).Days. <br />Not valid untll signed by both the Owner and Archltect. <br />Signature of the Contractor Indicates his agreement herewith, Including any adjustment In the Contract Sum 'or Contract Time. <br />ORIGINAL CONTRACT <br />FORMER CHANGE ORDERS 1 thru 4 <br />$1.903,286.00 <br />$ 5.426.16 <br />$1,908,712.16 <br />THIS CHANGE ORDER (ADILDEDUCT) s 43,111 _ on <br />SIGNED: <br />APR 2 6 1988 <br />REVISED CONTRACT PRICE $1,865,401.16 <br />• <br />ACCEPTED: <br />Indian River County Board <br />of County Commissioners <br />61 <br />BOOK 72 ilsE 220 <br />
The URL can be used to link to this page
Your browser does not support the video tag.