My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/3/1988
CBCC
>
Meetings
>
1980's
>
1988
>
5/3/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:09 PM
Creation date
6/12/2015 2:15:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/03/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WA <br />U.S. #1 SEWER AND WATER EXTENSIONS <br />The Board reviewed the following memo dated 4/21/88: <br />TO: CHARLES P. BALCZUN <br />COUNTY ADMINISTRATOR <br />THRU: TERRANCE G. PINTO <br />DIRECTOR OF UTILI aICES <br />FROM: JACK PEARCE6:>,/-./ <br />SPECIAL PROJECTS COORDINATOR <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: U.S. #1 SEWER AND WATER EXTENSIONS <br />BACKGROUND <br />DATE: APRIL 21, 1988 <br />As a result of repeated problems with the sewage systems at Kentucky <br />Fried Chicken and Taco Viva restaurants on U. S. #1 in Vero Beach, as <br />reported by the Environmental Health Department, this is a request_ for <br />approval of a Feasibility Study for correction of the problems. <br />The study will address an optimum solution for tie-in to a County sewer <br />line on 12th Street. <br />There is also a study option to connect these same properties to County <br />water. <br />RECOMMENDATION <br />The staff of this Department requests and recommends that the Board of <br />County Commissioners approve the Feasibility Study and that the work <br />project be granted to Marshall, McCully and Associates, with a 21 day <br />completion date. Marshall, McCully and Associates presented the lowest <br />quotation at $850.00. <br />The project will.be funded from the Utility funds assigned a 'project <br />number and eventually transferred to Project Design Engineering Costs. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bowman, the Board unanimously approved <br />the Feasibility Study and awarded the job to the low <br />bidder, Marshall, McCully and Associates in the amount <br />of $850, with a 21 -day completion date, as recommended <br />by staff. A 10 �=�,�r C �> (i of Co Al -M/4 c-7 <br />MAY 3 1988 27 <br />BOOK 72 t-�rrv,975 <br />
The URL can be used to link to this page
Your browser does not support the video tag.