Laserfiche WebLink
REQUEST_ FOR SPECIAL ASSESSMENT_ PAVING OF CERTAIN COLLECTOR ROADS <br />Administrator Balczun reviewed the following, stressing that <br />he would recommend awarding this work on the outside as the <br />County Engineering Department is too busy to handle this within a <br />reasonable period of time: <br />TO: Charles P. Balczun, <br />County Administrator <br />FROM: James W. Davis, P.E. <br />Public Works Director SINN <br />SUBJECT: Request for Special Assessment Paving of the <br />Following Collector Roads <br />1) Walker Ave - 66th Ave to Village Green <br />Phase 2 - length .5 miles <br />2) Walker Ave - West of 74th Avenue - <br />length .5 miles <br />3) 1st St. SW - 58th Ave. to 66th Ave. - <br />length 1.0 miles <br />4) 33rd St. (Cherry Lane) - 58th Ave to 66th Ave. - <br />length 1.0 miles <br />DATE: May 18, 1988 <br />DESCRIPTION AND CONDITIONS <br />The County staff has received petitions requesting Special <br />Assessment paving of 1st Street SW from 58th Avenue to 66th <br />Avenue and 33rd Street (Cherry Lane) from 58th Avenue to 66th <br />Avenue. The developer of Indian River Estates has requested the <br />na=ing of 26th Street west of 74th Avenue for approximately <br />�. Vista Plantation has, in the past, requested paving of <br />26th Street from 66th Avenue to Village Green MHP. All four of <br />the above roads are classified as Secondary Collector Roads on <br />the County Thoroughfare Plan. The paving of 26th Street (Walker <br />Avenue) is included in the County's Five Year Transportation <br />Plan. The paving of 1st Street SW is included in the County's 20 <br />year Transportation Plan during the years 2001 to 2005. <br />ALTERNATIVES AND ANALYSIS <br />The paving implementation of all four of the above roads will <br />require right-of-way acquisition. At the present time, the <br />County Engineering and Petition Paving crews are committed to <br />many projects previously approved, with many other projects <br />received in recent months. <br />The alternatives are as follows: <br />Alternative No. 1 <br />Distribute the projects for design to Consulting Engineering <br />firms already under Master Agreements with the County. The <br />Consultant would survey, design, and bid the paving. After bids <br />are received, a preliminary assessment roll would be prepared to <br />fund 50% of the cost since the roads are collector roads. A <br />public hearing would be held prior to approval. <br />56 <br />SAY 311999 BOOK 72 461 <br />