Laserfiche WebLink
PROJECT: <br />PROJECT <br />DESCRIPTION: <br />EXHIBIT F <br />PROJECT BUDGET - SPECIAL SERVICES <br />Indian River County . <br />Sludge/Septage Facility <br />Provide special services to include aerials, surveying, <br />and a soil investigation to be used during design; a <br />report to the CLIENT's Bond Consultant; grant <br />assistance; and permitting. <br />Agreement between CDM and Indian River County for <br />General Consulting Services. <br />ENGINEERING <br />SERVICES: Budget for special <br />services. <br />Category <br />Hours <br />Officer (ENEV-9) <br />40 <br />Engineer (ENEV-5). <br />116 <br />Engineer (ENEV-2) <br />135 <br />Engineer (ENEV-1) <br />78 <br />Designer (DNGN-4) <br />12 <br />Draftsman (DFGN-3) <br />26 <br />Project Administrator (AACT-3) <br />10 " <br />Secretarial (SEG -2) <br />115 <br />Direct Salary Cost <br />532 <br />Other Direct Costs: <br />Aerials <br />2,250 <br />Surveying <br />1,500 <br />Soils <br />2,500 <br />Printing, Materials, Etc. <br />7,500 <br />Total Estimate for Engineering Special <br />Services <br />e. <br />Total <br />$ 25,109 <br />$ 13,750 <br />$ 38,859 <br />Commissioner Eggert inquired how this ties in to any basic <br />contract we have. <br />Utilities Director Pinto explained that when we originally <br />came in to ask permission to move ahead with the regional sludge <br />facility, it was spelled out that this item would take place <br />further in the project.as a special service. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Wheeler, the Board unanimously (4-0) <br />approved Work Authorization #11 authorizing Camp, <br />Dresser and McKee to perform the described special <br />services for an up -set .limit of $38,859. <br />73 <br />Boo.. 72 ►',c478 <br />