Laserfiche WebLink
6706-07 <br />ATTACHMENT A <br />TO <br />CHANGE ORDER NO. 1 <br />FOR <br />CONSTRUCTION OF SANITARY SEWERS <br />IN THE <br />ROCKRIDGE AREA <br />GENERAL: <br />A. Allow time extension of 90 days for a <br />total of 360 days in lieu of 270 days <br />to complete contract. <br />I. PART A, ITEM 1.A.1, Abandonment of Septic <br />Tanks, 413 units <br />A. As per local code, allow Contractor to <br />bury lid in abandoned septic tank in <br />lieu of hauling to the landfill. $ 25.00 <br />Deduct $25.00 each <br />Total Deduct ($ 10,325.00) <br />II. PART A, ITEM 2.A.1, Grinder Pump Stations, <br />413 units <br />a Use anti -flotation ring and at least <br />5.2 cubic feet of concrete backfill <br />in lieu of concrete slab. <br />B. Use pump cradle mount in lieu of rails. <br />C. Use fiberglass access hatch in lieu of <br />aluminum. <br />D. Per local code, allow Schedule 40 elec- <br />trical conduit in lieu of Schedule 80. <br />E. Allow galvanized steel control panel <br />boxes in lieu of stainless steel. <br />F. Delete seal alarm. <br />G. Delete elapsed time meter. <br />H. Allow fiberglass junction box in lieu <br />of stainless steel. 35.00 <br />Deduct $397.00 each <br />Total Deduct ($163,961.00) <br />IRC.VB1 <br />5/24/88 <br />$ 100.00 <br />45.00 <br />150.00 <br />2.20 <br />30.00 <br />23.30 <br />11.50 <br />1. <br />79 <br />Boor. .4 <br />