M M
<br />Division I
<br />Restroom Building, Picnic Shelters, Concrete Walks, Playground
<br />Equipment, Etc.
<br />Rocheford-Baer Const.
<br />Corp. - Vero Beach
<br />Base Bid $219,815**
<br />Alt. 2 - Eliminate Skylights -2,700
<br />in restroom
<br />Alt. 3 - Eliminate Group
<br />Picnic Shelter
<br />Alt 5 - Substitute Fiberglass
<br />shingles for wood, shakes
<br />Alt. 6 - Delete Parking Lot
<br />lighting
<br />* Water system not bid
<br />** Water system bid at $6,000
<br />Division 2 - Dune Structures
<br />Base Bid
<br />Alternate No. 1 - Deduct
<br />Structure "B"'
<br />Division 3 -Landscaping
<br />Base Bid
<br />(Performance Bond)
<br />Division 4 - Irrigation
<br />Base Bid
<br />Division 5 - Parking Lot
<br />MacAsphalt
<br />-8,251
<br />-3,900
<br />-8,630
<br />Rocheford-Baer Const.
<br />- Vero Beach,Fl.
<br />$ 65,280
<br />-19,580
<br />Lounds Nursery, Inc
<br />Fort Pierce, F1.
<br />$ 21,273.25
<br />(-0-)
<br />Latter Rain
<br />Vero Beach
<br />$ 8,350
<br />Dickerson
<br />Barth Construction, Inc
<br />Vero Beach, F1.
<br />$197,570.63*,
<br />-1,400 _
<br />-9,407
<br />-7,800
<br />-6:232
<br />Barth Construction, Inc
<br />Vero Beach
<br />$ 92,760.80
<br />-24,869
<br />Barth Construction, Inc.
<br />Vero Beach
<br />$ 14,760.03
<br />($ 209.53)
<br />Barth Construction, Inc.
<br />Vero Beach
<br />$5,891.64
<br />Dennis L. Smith Barth Con
<br />Base Bid
<br />$175,640.50
<br />$172,441.00
<br />$170,181.70
<br />$174,359.
<br />Alt. 7 -
<br />(Substitute
<br />- 10,800.00
<br />- 8,000.00
<br />--14,676.00
<br />-14,,876.•
<br />Coquina Base)
<br />Subtotal.
<br />$164,840.50
<br />$164,441.00
<br />$155,505.70
<br />$159,483.(
<br />Alt..8 -
<br />(Delete Parking
<br />-14,000.00
<br />-17,762.00
<br />-10,266.40
<br />-16,456.1
<br />Spaces
<br />Subtotal
<br />$150,840.50
<br />$146,679.00
<br />$145,239.30
<br />$143,026.-
<br />20 `7r
<br />1 i99�
<br />'JUN 2 BOOK fxE 67
<br />
|