My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/21/1988
CBCC
>
Meetings
>
1980's
>
1988
>
6/21/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:10 PM
Creation date
6/12/2015 2:20:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/21/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTERNATIVES AND ANALYSIS <br />The work is basically typical of the Road and Bridge Division <br />base repair. Staff estimates that a grader, endloader, and <br />roller would be required. All materials would be funded by the <br />City of Sebastian. <br />The alternatives are as follows: <br />Alternative # 1 <br />Approve the request and authorize the Road and Bridge Div. <br />to assist. <br />Alternative #2 <br />Deny the request. <br />RECOMMENDATION AND FUNDING <br />Staff recommends Alternative # 1. The work could be scheduled in <br />August, 1988. Funding to be indirect costs of approximately <br />$4,000/week including labor and equipment. This cost is based on <br />equipment rental charges and labor. The work could be accom- <br />plished in approximately one week. Funding to be Fund 111-214, <br />Road and Bridge Dept. account. <br />Public Works Director Jim Davis advised that no impact fees <br />can be used on this project. Basically, the County's <br />contribution will be some equipment and some labor with no direct <br />expense to the County. <br />ON MOTION by Commissioner Bird, SECONDED by <br />Commissioner Bowman, the Board unanimously (3-0) <br />approved Alternative #1, authorizing the Road S <br />Bridge Division to assist in the repair work on <br />Barber Avenue and Schumann Drive. <br />ST. JOHNS RIVER WATER MANAGEMENT DISTRICT PERMIT FOR STORMWATER <br />DISCHARGE - PETITION PAVING PROJECTS <br />The Board reviewed the following memo dated 6/13/88: <br />28 sooK `7� Fo-cF 75 <br />'JUN 211988 <br />
The URL can be used to link to this page
Your browser does not support the video tag.