My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/2/1988
CBCC
>
Meetings
>
1980's
>
1988
>
8/2/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:11 PM
Creation date
6/12/2015 2:24:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/02/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'MODIFICATIONS TO THE SOUTH COUNTY REVERSE OSMOSIS PLANT - WORK <br />AUTHORIZATION AND CHANGE ORDER <br />The Board reviewed the following memo dated 7/21/88: <br />TO: CHARLES P. BALCZUN DATE: JULY 21, 1988 <br />COUNTY ADMINISTRATOR <br />THRU: TERRANCE G. PINTO <br />DIRECTOR OF UTILITY ICES <br />FROM: WILLIAM F. McCAIN <br />PROJECTS ENGINEER <br />DEPARTMENT OF UTILITY SERVICES <br />SUBJECT: SOUTH COUNTY REVERSE OSMOSIS PLANT <br />BACKGROUND <br />The South County Reverse Osmosis Plant expansion is currently <br />underway and on schedule. As planned, we are now ready to address <br />several problem areas within the plant, which are above the scope of <br />the on going construction atIthe site. <br />To save money, we are planning to submit this work under a Change <br />Order to the general contractor already on site. <br />ANALYSIS <br />There are two areas of need in the existing plan that we now wish to <br />address. They are as follows: <br />1. Modifications to the high service pumps as outlined in the <br />high service pump study which was authorized by the Board and <br />completed by DSS Engineers, Inc. The engineering services to cover <br />this portion of the change order which involves preparation of plans <br />and specifications, will be covered by approving the attached Work <br />Authorization number 17 for $3,000.00. <br />2. The remainder of this Change Order involves miscellaneous <br />piping and electrical changes within the Plant. The engineering <br />services,.will be covered by approving Work Authorization number 07B <br />for $4,768.00. The exact work break down under this work <br />authorization is attached to this document. <br />:..:. RECOMMENDATION _ <br />_ The Utilities staff recommends approval of the two attached work <br />authorizations so that the work maybe accomplished via a Change. <br />order to the general contractor currently on site. <br />1' 3 BOOK <br />A U G 2 19®® 7PACE •,� <br />
The URL can be used to link to this page
Your browser does not support the video tag.