My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/2/1988
CBCC
>
Meetings
>
1980's
>
1988
>
8/2/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:11 PM
Creation date
6/12/2015 2:24:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/02/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />INDIAN RIVER COUNTY <br />n <br />DSS NO: 130 <br />Estimate Date: 6/13/88 <br />Work Order Number 07B, for additional services as deliniated below. <br />1. The following work will be done under this work authorization: <br />a. Furnish and install 10" purge and reject water piping at wall <br />penetrations. Prepare drawing number 130-69-02: <br />Project Engineering 16 hours x 55 e $ 880.00 <br />Drafting Work 24 hours x 25 — 600.00 <br />Sub -Total — $1,480.00 I, <br />b. Furnish and install revised piping from well pump No. 4. Work tof <br />include preparation of new piping material specification No. PI51C, <br />revise drawings No. 130-02-05, 130-47-01 and 130-62-01: <br />Project Engineering 12 hours x 55 — $ 660.00 <br />Drafting Work 16 hours x 25 m 400.00 <br />Clerical Work 2 hours x 22 v 44.00 <br />Sub -Total m $1,104.00 <br />C. Furnish and install new.circuit breakers for B101A and B101B and revised- <br />site starters and breakers for B102A and B102B. <br />Revise drawing No. 130-80-04 accordingly: <br />Project Engineering 4 hours x 55 — $220.00 <br />Drafting Work 4 hours x 25 — 100.00 <br />Sub -Total — $320.00 <br />d. Furnish and install new permanent 440V cables at the 440v service <br />entrance between transformer secondary connection and switchgear bus <br />connection. Prepare drawing No. SK -130-80-01: <br />Project Engineer 8 hours x 55 — $440.00 <br />Drafting Work 4 hours x 25 — 100.00 <br />Clerical Work 2 hours x 22 m 44.00 <br />Sub -Total = $584.00 <br />e. Furnish and install 16" blend water piping at wall penetrations. <br />Prepare drawing No. 130-69-03: <br />Project Engineering 16 hours x 55 — $ 880.00 <br />Drafting Work 16 hours x 25 — 400.00 <br />Sub -Total m $1,280.00 <br />AUS 1998 <br />17 BOOK 73 FADE 328 <br />
The URL can be used to link to this page
Your browser does not support the video tag.