My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/20/1988
CBCC
>
Meetings
>
1980's
>
1988
>
9/20/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:00:11 PM
Creation date
6/12/2015 2:26:06 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
09/20/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TO: WILLIAM G. COLLINS, II <br />ACTING COUNTY ADMINIS OR <br />THRU: TERRANCE G. PINT <br />DIRECTOR OF UTILITY ERVICES <br />FROM: WILLIAM F. McCAINA-- '� <br />PROJECTS ENGINEER`S <br />DEPARTMENT OF UTILITY SERVICES <br />DATE: AUGUST 26, 1988 <br />SUBJECT: WATER LINE REPLACEMENT - 6TH AVENUE AND 15TH STREET <br />BACKGROUND <br />The location of this project is 6th Avenue and 15th Street. For <br />several months we have been receiving numerous complaints on water <br />color and taste from residents served off of water lines on the <br />above mentioned streets. We wish to take emergency action to <br />replace.these lines as the problem is quite severe both from a <br />maintenance standpoint,. due to the need to continually flush the <br />lines as well as from e customer relationship standpoint. <br />ANALYSIS <br />The problem is the age of the water lines. This has become a <br />problem, primarily due to the material of the lines which is <br />galvanized steel pipe. The lines are so corroded the water runs out <br />brown. We have gotten several estimates for the replacement of <br />these lines, the lowest of which was'from Belvedere -Construction in <br />the amount of $19,750.00 which is attached. <br />RECOMMENDATION <br />The Department of Utility Services recommends that.the Board of <br />County Commissioners approve this action on an emergency basis -so <br />that we may proceed immediately. <br />ON MOTION by Commissioner Eggert, SECONDED by Com- <br />missioner Bird, the Board unanimously approved the <br />emergency replacement of water lines at 6th Avenue <br />and 15th Street by Belvedere Construction Co. in <br />the amount of $19,750. as recommended by staff. <br />63 <br />SSP 20 1988 BOOK 74 FnE 34 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.